05/07/2026
STOP EXPLAINING YOUR PROFESSIONAL FEES TO PEOPLE WHO ARE NOT LOOKING FOR PROFESSIONALS
Truth is bitter.
There are some clients you should not waste your time trying to convince.
That person is not comparing professional work with professional work.
They are comparing proper construction with shortcuts.
How do you compare a contractor who will:
• Excavate to the required depth until competent bearing soil is reached.
• Construct a proper reinforced concrete foundation.
• Cast the foundation with the specified concrete thickness, typically not less than 150 mm, and often 225 mm where soil conditions require it.
• Build foundation blockwork correctly, with the required number of courses below and above ground level depending on the design and site levels.
• Follow structural drawings, specifications, and good construction practice.
…with someone who simply places mortar on the ground, skips proper excavation, ignores foundation requirements, and starts building?
Those are not the same products.
So why should the prices be the same?
If a client cannot distinguish between professional construction and quackery, you do not owe them endless explanations.
Take your knowledge.
Take your experience.
Take your integrity.
Walk away.
Go where professionalism is respected and quality is valued.
The more you keep defending your price to people who do not value proper construction, the more frustrated you become.
Not every prospect is your client.
Protect your reputation.
Protect your standards.
Let those looking for professionals find professionals. Let those looking for shortcuts take responsibility for the consequences of their choices.
If the attached picture is the type of construction process you are looking for, please go to Berger Under Bridge. You will likely find your match there.
As for professionals, let us breathe.
Professional construction is not the cheapest option. It is the safest, the most durable, and the most accountable.
If your priority is cutting corners at all costs, we are simply not the right fit.
We would rather walk away from a project than compromise professional standards.
We Linkgem stocks limited deliver quality and that comes at a price.