19/08/2021
We build Nutec, Wendy house and vibe crete house
Renovation and relocate existing structure
Plumbing,electrical,ceiling and lining
Tiling ,laminated floor
Rhino board
Partioning and inside door start its 2 000 per each partition
Electricals range from 3000 to 10 000 is depends how big structure is and include plugs lights ,wiring and the box( D.B)distribution
BATHEROOM plumbing 8 500 that include toilet basin shower and connecting sewege pipe outside
KITCHEN plumbing R3 000 that is a single bowl sink with cabinet
Concerete slab fountation depends how big of your structure
0603836562/0623721898