MEP WORK

MEP WORK MEP Calculation sheets, CAD & Revit Drawings, PDF Notes & Tutorial Videos for HVAC, Firefighting, Plumbing & Electrical Works.

Essential HVAC drawings required before site ex*****on
04/08/2026

Essential HVAC drawings required before site ex*****on

Every fire protection system, fire alarm, fire pump, standpipe, and smoke control strategy is ultimately governed by sta...
23/07/2026

Every fire protection system, fire alarm, fire pump, standpipe, and smoke control strategy is ultimately governed by standards.

Some of the most important ones every MEP engineer should know are:

✓NFPA 13 – Automatic Sprinkler Systems

✓NFPA 14 – Standpipe Systems

✓NFPA 20 – Fire Pumps

✓NFPA 72 – Fire Alarm & Signaling Systems

✓NFPA 90A & 90B – HVAC Air Distribution & Smoke Control

✓NFPA 101 – Life Safety Code

understanding of NFPA Standard code.

Dew Point Temperature Why Does Every Air Conditioning Unit Need a Condensate Drain?One of the most common questions in t...
15/07/2026

Dew Point Temperature

Why Does Every Air Conditioning Unit Need a Condensate Drain?

One of the most common questions in the HVAC field is:

Why do all air conditioning units, such as FCUs, AHUs, and DX units, require a condensate drain line?

The answer begins with understanding the concept of the Dew Point Temperature.

The air around us is not dry air; it is moist air, meaning it contains a certain amount of water v***r. The amount of moisture the air can hold depends on its temperature and relative humidity.

The dew point is the temperature at which the air becomes fully saturated with water v***r (Relative Humidity = 100%). At this point, the air can no longer hold any additional moisture, causing the water v***r to condense into liquid water.

Practical Example
Room air temperature: 26°C
Dew point temperature: 15°C
Cooling coil temperature: 11–13°C

As the warm, humid air passes over the cooling coil, its temperature gradually decreases.

When the air temperature reaches 15°C (its dew point), it becomes 100% saturated.

As the air continues to cool below the dew point, it can no longer retain all of its water v***r. The excess moisture condenses on the surface of the cooling coil, forming water droplets.

These condensate droplets collect in the drain pan and are then discharged through the condensate drain line.

HVAC Basic Calculations Based on ASHRAE
01/07/2026

HVAC Basic Calculations
Based on ASHRAE

Electrical BIM Engineer Revit Interview Test Sample
05/01/2026

Electrical BIM Engineer Revit Interview Test Sample

Free pdf file includes electrical BIM interview test sample, questions based on practical test.

Address

Nasr City

Alerts

Be the first to know and let us send you an email when MEP WORK posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MEP WORK:

Shortcuts

Share