09/08/2026
š§ BANK STABILIZATION | CITY OF YOUNGSVILLE / LAUREL GROVE NEIGHBORHOOD
From severely eroded to almost finished ā and what a transformation.
Bailand Construction is nearing completion on this horrendously eroded drainage bank surrounding a City of Youngsville lift station, and we couldnāt be happier with how this one turned out. Finishing up compaction of backfill dirt todayyyyy in this blistering HEAT!
What started as a heavily deteriorated bank with active erosion threatening the surrounding property has been transformed into a clean, stable, properly protected drainage corridor built to stand up to the elements.
This is exactly why we do what we do.
šŖ Erosion control isnāt something we take lightly.
š Protect the bank.
šļø Protect the infrastructure.
š± Restore the property.
ā
Build it right the first time.
The finished product is PERFECT ā but weāll have to save those photos for another post. š
Another project nearly in the books for Bailand Construction and another bank brought back from the brink.
Need an eroded bank stabilized before it becomes a much bigger problem? Give us a call.