Progress in Henry County, built from the ground up.
This 204-lot subdivision spans roughly 108 acres, with Carmichael Development leading the sitework that prepares the entire property for what comes next.
From mass grading and erosion control to storm drainage, water, and sewer utility installation, our team has been moving through a major scope of work across the site.
With approximately 400,000 CY of earthwork and 56,000 LF of pipe involved, there is a lot happening above ground, below ground, and everywhere in between.
Mass grading is nearing completion, underground utilities are actively progressing, and our crews continue to adjust to changing field conditions while keeping safety, productivity, and quality at the front of the job.
This is the work future roads, homes, and community connections are built on.
•••