08/21/2026
H A P P Y F R I D A Y 😎
A little behind-the-scenes look at what our Ruggerio’s crews have been working on lately! 👷♂️🌿
Slide 1: A recent project at the Red Clay bus yard, where our crew completed extensive landscape and erosion-control work including river rock, rip rap, fresh mulch, topsoil, seeding, and erosion matting.
Slides 2 & 3: Progress on an ongoing residential project — removing damaged driveway concrete, installing a new channel drain and drainage system, and pouring fresh concrete to improve both function and drainage.
Slide 4: Another project that hits close to home! After recently completing work at St. Thomas, where our owner attended grade school, our crew is now at Dickinson High School, where he spent his high school years, completing approximately 90 feet of chain-link fence repair and replacement. A pretty cool continuation of that full-circle moment for Ruggerio’s. 👏
From commercial properties to residential projects and everything in between, there’s always something happening at Ruggerio’s. 💪