07/24/2026
The Outlook house build is moving along on the exterior. With the Sierra Pacific windows installed we were able to get all the board and batten LP Smart Siding installed followed by 4x8 accent beams to cover a nice color contrast.
Timbertech decking was layed down with hidden fasteners and the Provia Stone work is moving along well.
With the exterior just about wrapped up we will move inside to start buttoning up the interior work.
Give us a call/message for any of your building needs. Start to finish we have you covered.