Power Substation Services

Power Substation Services Power Substation Services specialized in the installation and maintenance of substation electrical transformers.

President Brad Joseph and Director of Operations Rich Parrish representing PSS at the PowerTest Conference in Nashville,...
03/03/2026

President Brad Joseph and Director of Operations Rich Parrish representing PSS at the PowerTest Conference in Nashville, TN.

We successfully assembled, filled, and tested a new 10 MVA transformer for a municipal utility in Iowa last week.
01/12/2026

We successfully assembled, filled, and tested a new 10 MVA transformer for a municipal utility in Iowa last week.

During this hot summer, we successfully completed the installation of a new 345 kV transformer, overcoming challenging s...
08/15/2025

During this hot summer, we successfully completed the installation of a new 345 kV transformer, overcoming challenging site conditions thanks to the dedication and hard work of our exceptional crew.

06/28/2025

While performing a transformer installation project in Texas, the crane operator provided us with this video.

We have expanded our operations to include a full transformer fluid testing laboratory at our facility. Testing the diel...
06/06/2025

We have expanded our operations to include a full transformer fluid testing laboratory at our facility. Testing the dielectric fluid is an important gauge of the overall health of your transformer. Please contact us for competitive pricing.

Representing at PowerTest 2025!!
03/12/2025

Representing at PowerTest 2025!!

We recently completed the assembly, vacuum-filling and acceptance testing of four 60 MVA transformers in the Reno, NV ar...
09/11/2024

We recently completed the assembly, vacuum-filling and acceptance testing of four 60 MVA transformers in the Reno, NV area. The client and site contacts were very impressed with the overall efficiency of the field service crew performing the work.

PSS performing assembly, top off and acceptance testing on a new 7.5 MVA transformer.
05/08/2024

PSS performing assembly, top off and acceptance testing on a new 7.5 MVA transformer.

Having a great week representing EPS and PSS at the International Conference of Doble Clients.
03/27/2024

Having a great week representing EPS and PSS at the International Conference of Doble Clients.

Replacing bushings on a GSU transformer.  While onsite, we were able to assist the customer is determining leaks on this...
03/19/2024

Replacing bushings on a GSU transformer. While onsite, we were able to assist the customer is determining leaks on this transformer along with another transformer at the facility.

Our crews recently performed a complete refurbishment of a spare GSU transformer for a large utility.   The crew fought ...
01/12/2024

Our crews recently performed a complete refurbishment of a spare GSU transformer for a large utility. The crew fought through some cold weather but got the job done safely, efficiently and under budget.

Address

4 Industrial Park Drive
Wheeling, WV
26003

Alerts

Be the first to know and let us send you an email when Power Substation Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Power Substation Services:

Share