09/10/2026
Boston South End full restoration
Removed all old materials and woodwork.
Replace with new scalloped purple slate.
All new casings around windows and covered with copper.
New copper shelf and radius copper gutter
Copper covered facia under gutter.
Repainted. Entablature and wooden dental woodwork
New 4 inch copper drainpipe
Mechanically fastened with copper bar and soldered
Front entrance roof
New rubber roof copper raglett in the brick
New copper tapered edge cleat.
Re caulked all trim around lower windows .
Job 100% completed