BuildWright Construction Inc.

Directions Website Contact the business

BuildWright Construction Inc. Licensed LA remodeling contractor for whole-home remodels, additions, ADUs, kitchens and baths.

Buildwright Construction is a veteran in custom home remodel in Van Nuys, CA, offering extensive home upgrades through new utility installation, space reclamation and functionality addition. It goes on to fully transform the existing floor layout of the house, and make any home interior extra spacious and luxurious for a growing family. Experts in full house remodel, by the way of adding new space, design, style, functionality and user-friendliness to home interiors & exteriors.

Custom office cabinets should solve something—not just fill a wall.For this project, we built cabinetry into the wall re...
10/10/2026

Custom office cabinets should solve something—not just fill a wall.

For this project, we built cabinetry into the wall recess, with three long shelves above and drawers and cabinets below.

The open shelves give photos, plants, and personal pieces a place. Closed storage provides room for everyday office supplies without putting everything on display.

The dark, textured finish connects the whole wall. It’s a practical example of planning cabinetry around the space and what needs to go in it.

Planning a home office or custom cabinetry project? Visit BuildWright Construction:
https://bwc-inc.com/

Most remodel photos skip this stage. It's not pretty, but it matters more than anything that goes on top of it.This is n...
10/09/2026

Most remodel photos skip this stage. It's not pretty, but it matters more than anything that goes on top of it.

This is new plywood sheathing over the framing, nailed off the way the plans specify. Once the walls are closed, nobody sees it again. So it gets checked before anything covers it: by us, and on permitted work, by the city inspector.

Interviewing contractors? Ask how they check work before it gets covered. The answer tells you a lot.

When Sherry called us, her Pasadena house had been through a double water leak. Half of it needed rebuilding.We handled ...
10/08/2026

When Sherry called us, her Pasadena house had been through a double water leak. Half of it needed rebuilding.

We handled it as one project: a new primary bathroom with a freestanding tub and walk-in shower, a powder room, new hardwood floors and French doors in the living room, and a rebuilt laundry room.

In her review, she wrote that the craftsmen were "careful and detailed" and that everything was "straightforward, no up-selling."

More projects: bwc-inc.com/projects/

What should happen after the major work is complete?The contractor and homeowner should complete a final walkthrough, cr...
10/07/2026

What should happen after the major work is complete?

The contractor and homeowner should complete a final walkthrough, create a written list of remaining contracted items, assign responsibility, track completion, and confirm when each item is resolved.

New requests should be separated from corrections or incomplete work covered by the original agreement. The closeout process should also identify which project records, operating information, approvals, and applicable warranty documents will be provided.

At BuildWright, the final walkthrough and punch-list follow-through are part of the project—not an informal favor after the main work is finished.

If you’re planning a substantial remodel and want clear responsibility through closeout, send BuildWright a message.

Should you stay home during your remodel or move out temporarily?The answer depends on more than the project size. Consi...
10/06/2026

Should you stay home during your remodel or move out temporarily?

The answer depends on more than the project size. Consider access, utility shutdowns, noise, dust, children, pets, working from home, and which parts of the house will remain usable during each phase.

Before construction starts, identify:

• Available bathrooms, kitchen functions, bedrooms, entrances, and parking
• Expected water, power, HVAC, and appliance shutdowns
• Temporary food, hygiene, storage, charging, and work areas
• Separation between construction and living spaces
• A backup point that would trigger a temporary move

Phasing can reduce disruption, but it can’t make every remodel comfortable to live through.

Use the actual construction sequence and your household’s limits to make the decision—then review it as the work progresses.

Before demolition begins, walk the route workers, materials, tools, and debris will use through the property.Document th...
10/05/2026

Before demolition begins, walk the route workers, materials, tools, and debris will use through the property.

Document the existing condition and identify:

• Work and occupied areas
• Floors and nearby surfaces requiring protection
• Material and tool-storage locations
• Debris-removal paths
• Dust barriers and cleanup expectations
• How accidental damage will be reported and addressed

The protection should match the actual work. A small bathroom remodel and a whole-home renovation won’t require the same setup.

Construction still creates dust and risk. The purpose of the plan is to protect the property, organize the site, and establish responsibility before the work begins.

When a contractor says, “We handle the permits,” ask what “handle” means.A permit process may include plans, supporting ...
10/04/2026

When a contractor says, “We handle the permits,” ask what “handle” means.

A permit process may include plans, supporting documents, professional consultants, city submission, fees, inspections, corrections, and final sign-off.

Your remodeling agreement should clearly identify:

• Who prepares and submits the documents
• Who pays the city and professional fees
• Who schedules inspections
• Who responds to required corrections
• What is included in permit closeout

Permit requirements vary by project, property, and jurisdiction. BuildWright coordinates permits and inspections when included in the agreed scope.

A vague promise isn’t a permit plan. Get the responsibilities in writing before work begins.

Bathroom-selection overload usually isn’t a lack of taste. It’s a sequencing problem.Start with the decisions that contr...
10/03/2026

Bathroom-selection overload usually isn’t a lack of taste. It’s a sequencing problem.

Start with the decisions that control the work:

• Lock the layout and clearances
• Confirm plumbing, electrical, ventilation, and framing requirements
• Finalize the vanity, sink, countertop, and major surfaces
• Coordinate the tile, trim, grout, transitions, and niche details
• Finish with lighting, mirrors, glass, hardware, accessories, and paint

The exact order may change based on the project and product lead times. What matters is knowing which decision is needed next, what work it controls, and when it must be approved.

BuildWright helps homeowners focus first on choices that affect function or would be difficult to change later.

A kitchen isn’t used by one person standing still.Before approving a kitchen-remodel layout, test what happens when two ...
10/02/2026

A kitchen isn’t used by one person standing still.

Before approving a kitchen-remodel layout, test what happens when two people cook, clean, open appliances, and move through the room at the same time.

Where practical, mark the island and cabinet runs on the floor with tape. Add the refrigerator, oven, dishwasher, cabinet, and entry-door swings.

Then walk through a normal routine:

Can someone pass while the dishwasher is open? Is there enough room behind the seating? Are frequently used items stored where they’re needed? Are the outlets and lighting positioned around actual tasks?

BuildWright uses planning and 3D design to help homeowners evaluate appearance and daily function before construction.

Fixing the layout now is much easier than changing it after the cabinets arrive.

Once work is covered by drywall, tile, cabinets, or another finished surface, correcting a problem becomes much more dif...
10/01/2026

Once work is covered by drywall, tile, cabinets, or another finished surface, correcting a problem becomes much more difficult.

Before construction begins, ask your contractor which quality checks will happen before each stage is covered.

Depending on the scope, those checks may include preparation, framing and backing, rough plumbing and electrical, HVAC, waterproofing, weather protection, and required inspections.

Progress photos can help document the work, but they don’t replace proper installation, supervision, or inspections.

BuildWright’s standard is simple: check the right work at the right time, while it’s still visible and can be corrected properly.

Address

2426 Townsgate Road #200
Westlake Village, CA
91361

Opening Hours

Monday 12am - 11:45pm
Tuesday 12am - 11:45pm
Wednesday 12am - 11:45pm
Thursday 12am - 11:45pm
Friday 12am - 11:45pm
Sunday 12am - 11:45pm

Alerts

Be the first to know and let us send you an email when BuildWright Construction Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BuildWright Construction Inc.:

Shortcuts

Share