05/30/2026
A new foundation was required for this small camp addition. We utilized hydraulic jacks and support columns to lift the 16’x22’ structure sufficiently to remove the existing foundation. Following the removal, we demolished and removed the old footing, which was only a few inches thick. Subsequently, we excavated for a new 12” footing, installed rebar, and poured new concrete. New CMU was installed, solidly grouted at each corner and every 4’ with rebar reinforcement. The structure was then lowered back to its original height.