03/12/2026
Sometimes the past shows up in the middle of excavation.
While digging the foundation for Lot 2 at Lockwood Lane, we uncovered remnants of the original estate foundation that once occupied the property.
Rather than remove it, our engineering team designed a reinforced footing and wall system that allows the new garage foundation to span over the existing structure.
Quick decisions. Strong engineering. Project stays on track.
Thanks to AEC Engineers for always answering the call.