09/19/2026
Here is the Bath Fitter Gone Wrong bathroom. Yes, you read that correctly. Even though it was still covered under their supposed warranty, I’m certain they wouldn’t stand behind it… we tore out this “one day tub make over system” that was advertised to be laser measured 🤦🏼.
This project was broken into two parts. The tub being handled at the earlier part of the year to get the customer back up and running after the existing tub was leaking, cracked and had black water standing between the slip over cover and original tub. We installed a fresh Sterling tub with new MOEN shower valve following remove soffit, relocate some lighting and the fan, install a new toilet, drywall & paint. Along the way we closed up the walls with custom sized niches & tile backer following tile the walls over tub.
Part two consisted of selecting a custom built Amish vanity which came finished in Mount Etna color by Sherwin Williams. We were able to utilize the entire 82” width of the space and not waste any of it using fillers. The cabinet was complimented with Cambria quartz top with double sinks and coordinated MOEN fixtures in bronzed gold. New mirrors, cabinet hardware & lighting was done following painting the bathroom walls & ceiling. This one turned out great!