Before the holiday break we had the opportunity to tackle two bathrooms for a customer while they were away on vacation. It means a lot when a customer puts their trust in us to work within their home when they are not even in the same state. It also makes doing what we do a lot easier, as we were able to tear down both bathrooms at the same time and rebuild them without interruption of for daily use.
It started on the second level, where we removed a cast tub with and glue up wall system, vanity, top, toilet lights and both soffits, allowing for the eye to play less Tetris when entering the space, but also give it a larger more open feel. We reworked electrical & plumbing then closed up the walls and refinished the drywall. Fresh coat of paint, a new shower pan set and wrapped the space in tile following installation of the Shiloh vanity stained in a Harbor Sherwin Williams color and a quartz top and under mount sink. New LVP, towel bars, coordinated MOEN fixtures, new white craftsman trim, toilet, LED lighting and an upgraded 110cfm exhaust fan properly exhausted through the roof. Completed with a Sterling semi frameless glass shower door.
The customer was very satisfied when they returned home to find their new bathroom space and excited for the updated space after 40yrs of the old one! Thank you for trusting us with the process, design and building of your space.