Midcoast Concrete Pumping

Midcoast Concrete Pumping Concrete Pumping in Maine with 42+ years of combined concrete pumping experience. Residential • Commercial • Industrial • DOT
Call or Text 207-230-4900

08/13/2026

What’s going in next to AT&T in thomaston? 🤔

08/13/2026

Don’t worry Thomaston, you can still go through the drive thru at Starbucks for your morning coffee. They are currently out of blueberry muffins though..

Be sure to head over to the Union fair today! A little rain won’t hurt ya 🌧️ I know we’re most excited for the demolitio...
08/08/2026

Be sure to head over to the Union fair today! A little rain won’t hurt ya 🌧️ I know we’re most excited for the demolition derby this afternoon 🚗

Today is Agricultural Day at the Union Fair sponsored by Midcoast Concrete Pumping.

Come see Bigfoot throughout the day.

Demo Derby sponsored by Gophers Dirt starts at 6pm.

Come early to avoid the traffic.

08/06/2026

Come see Aidan Kaczynski play tonight 8pm at Union Fair! 🎸 🎶

07/27/2026
What size concrete pump do you need?Choosing the right concrete pump isn't about how many yards you're pouring—it's abou...
07/25/2026

What size concrete pump do you need?

Choosing the right concrete pump isn't about how many yards you're pouring—it's about reach.

Before every job, we consider things like:

✔️ How far the pump needs to reach
✔️ Whether we need to go up and over a house or other obstacles
✔️ Power lines and overhead clearance
✔️ Access to the job site
✔️ Whether the pour is inside a building

Every job site is different, which is why we ask a few questions before scheduling. If needed, Rob will even stop by the site to make sure we send the right pump and have the safest, most efficient setup for your pour.

We just published a new blog explaining how it all works. Check it out!

📍 https://midcoastpumping.com/resources/what-size-concrete-pump/

We’re excited to sponsor the union fair this year!
07/21/2026

We’re excited to sponsor the union fair this year!

"Why do concrete pump companies have a 4-hour minimum?"We get asked this a lot.A lot of people think the job starts when...
07/18/2026

"Why do concrete pump companies have a 4-hour minimum?"

We get asked this a lot.

A lot of people think the job starts when the concrete starts pumping, but there's a lot more that goes into every pour. Travel, setup, unfolding the boom, pumping, washing everything out, packing it back up, and getting ready for the next job all take time—whether we're pumping 3 yards or 30.

We put together a quick blog that explains why the 4-hour minimum is pretty standard in the concrete pumping industry.

Take a look if you've ever been curious:

👉 https://midcoastpumping.com/concrete-pumping/why-do-concrete-pump-companies-have-a-4-hour-minimum/

Address

54 Montgomery Avenue
Warren, ME
04864

Alerts

Be the first to know and let us send you an email when Midcoast Concrete Pumping posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share