DJE Construction Welcome to DJE Construction where quality meets innovation on every build.

Every home we build starts with a conversation, not a floor plan.This rendering is where our design process begins. Afte...
09/30/2026

Every home we build starts with a conversation, not a floor plan.

This rendering is where our design process begins. After we sit down with our clients and hear what they want - the style, the materials, and how they actually live day to day - we start with renderings. That way we know our thinking lines up with theirs before a single line of the plans gets drawn.

These clients are building on a ridge, and they had two big goals:

- Feel the outdoors even while they're inside - big glass, open views, and natural stone and timber pulling the landscape into the house
- Plenty of outdoor space for entertaining - a covered deck, a walk-out patio with fireplaces, and a fire pit area for evenings with family and friends

Once the rendering feels right to them, we design the plans around it. That's what custom means to us. We design around your lifestyle, your land, and your needs, not a stock plan.

**Want to be building this spring? The time to start design is now.** Good plans take time, and getting yours done over the winter means you're ready to break ground when the weather turns.

Start Your Build - message us or visit DJE-Construction.com

09/29/2026

A detail most people miss on their plans: the step from the garage into the house.

With a block foundation and 16" floor trusses, your garage slab sits well below your floor, and that gap has to be made up with steps inside the garage. If you plan for it early - 12" block on the bottom courses to recess the trusses - the slab runs right up flush and you get a simple 3/4" step into the house.

Small decisions at the plan stage make a big difference in how your home lives every day. Start Your Build with DJE Construction.

09/28/2026

Foundation block is in. Our block crew laid this entire foundation in a day and a half - three guys, and they absolutely killed it.

Now we check every measurement before a single piece of lumber goes on top. Porches, house, garage - here's how this foundation turns into a home.

Thinking about building? Start Your Build at DJE-Construction.com

Those tubes are the receipts. On this commercial addition the state required special inspections on the footer - soil co...
09/28/2026

Those tubes are the receipts. On this commercial addition the state required special inspections on the footer - soil compaction verified and concrete strength tested. The inspector fills cylinders straight off the pour and a lab breaks them to prove the mix hit strength. Nobody takes anybody's word for it. Residential or commercial, the standard does not change on our jobs.

09/28/2026

What is a frost line? It is how deep the ground freezes in winter. Water in the soil freezes, expands and lifts whatever is sitting above that line. On an addition you inherit whatever the original builder did, so we measure it, we do not assume it. If the math comes up short, the pour waits.

09/25/2026

Part 2 - here is how the footer problem got solved. We could have poured that morning. We did not. Six inches of footing, eight of block, four of dirt on top, and the number still was not where it needed to be. So the concrete truck waited on an engineer's letter instead of the other way around. That is the difference between hitting a schedule and building something that lasts.

09/23/2026

The call you do not want: "we have got a little bit of a problem." Small town, older building, no inspections back when it went up - so the plans and what is actually in the ground do not always match. Existing footer was six inches thick and did not go below the frost line, which means there is nothing solid to pin the new footer to. You can plan an addition for months and still not know what you have until you open it up. Architect and engineer get a call, we get an updated drawing and approval, then we pour. That is the order it goes in.

Start Your Build: DJE-Construction.com

We break ground soon on a new custom home in Hillsboro.3,719 finished square feet. Two stories, a full covered front por...
09/02/2026

We break ground soon on a new custom home in Hillsboro.

3,719 finished square feet. Two stories, a full covered front porch, and a family who spent a year getting the plan exactly right before we ever moved dirt.

That's how it should go. No surprises, no guessing at the number halfway through, no builder who goes quiet when it gets hard. A proven process and straight answers, start to finish.

Wondering what your build would actually cost? Get your estimate in about two minutes: [dje-construction-bb5d82dc.viktor.space/cost-to-build](https://dje-construction-bb5d82dc.viktor.space/cost-to-build)

08/28/2026

Address

1460 Colgan Road
Wallingford, KY
41093

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+16067482929

Alerts

Be the first to know and let us send you an email when DJE Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DJE Construction:

Shortcuts

Share