08/03/2021
If you are a building owner or property manager looking for a new roof you are probably experiencing longer lead times than normal for materials deliveries. There are material shortages, rising prices, and extended lead times on almost all construction materials. For instance, single-ply roof systems are running between 6-8 months due to insulation and fastener shortages. If you have a rush project or a project you hoped to have completed before the end of the year for tax purposes, you still have options. While metal prices are at an all-time high and lead times are much longer than normal ReRoof USA is still able to design and engineer, permit, and deliver projects within 8-10 week lead times. With an average of 15,000 square feet per week production, there is still an opportunity to get your roof replaced or recovered before the end of the year. Our metal recover systems can work over existing metal, shingle, and flat roof systems. We offer a premium site-formed continuous standing seam roof system that can be designed to fit your project and needs.
Please call today if we can be of service.
Andy Sullivan
770-456-1611
[email protected]