10/09/2026
Step five was skipped and labeled step six, so this is the jumble of chaos that was parts of my attempt to get back on track: Not pictured was the endless days of rain that started as soon as I put the paint booth up on Monday, the first run with a new sprayer and the pressure set too high, going on a second material run because I forgot to account for some door frames, and a third material run because I'm my frustration I forgot to account for tongues and grooves. In other words, it's been a disaster of a week, but like I told my client I've never let a project beat me, and this one will not be the first. However here are photos of prepping the cabinet dados and grooves, the paint both fending off the outskirts of a hurricane, and 70+/- gallons of saw dust where my main barrel overflowed. Into the second barrel sitting under my clogged up filter.