06/13/2026
A foundation we were able to do with Spencer Gierman for a new home out off of M22. This house plans to go up, rather than out. So with the 4’ under finished grade to keep the frost out, and 10’ of wall above that, we alternated stacking 9’, and 5’ panels. With two rows of Walers, and “stiff back” bracing every 8’, we poured this thing nice and easy in 3 different “lifts”, while two ground guys straightened and adjusted the turnbuckles attached to the stiff backs to keep the walls straight, and square.