AXIA Construction Built Right. Worth More. Florida License: CGC1536451

AXIA Construction is a licensed Florida general contractor serving Tampa Bay, specializing in residential and commercial new construction, shell contracting, custom homes, and structural additions.

09/18/2026

✨ Project Spotlight: Modern Custom Home β€” Soniq Window Installation Underway ✨

This project continues making strong progress as SONIQ Windows and Doors are now being installed throughout the home.

With the structural shell in place, this phase brings the design into sharper focus. The new window systems are helping define the home’s modern architecture, strengthen the exterior appearance, and bring more natural light into the major living spaces.

Progress Highlights

βœ… Soniq window installation underway
βœ… Large openings now being filled across key elevations
βœ… Modern architectural lines becoming more defined
βœ… Exterior faΓ§ade taking on a more complete appearance
βœ… The project moving closer to full enclosure

BUILT RIGHT. WORTH MORE.

🌐 https://axiaconst.com/
πŸ“ž (813) 434-3107 | License

09/17/2026

✨ Project Spotlight: Custom Home β€” Framing Near Completion, Roof Trusses Set & ZIP Sheathing Underway | Phase 4 ✨

This custom home has reached a major structural milestone as framing moves into its final stages and the full scale and architectural form of the residence come into view.

Following completion of the second-floor structural framing and decking, crews advanced through the third-floor framing, flew and set the engineered roof trusses, framed the stair systems and interior spaces, and continued installation of the ZIP System exterior sheathing as the home moves closer to dry-in.

Progress Highlights

βœ… Exterior and interior wall framing nearing completion
βœ… Engineered roof trusses flown and set, establishing the home’s roof structure and architectural profile
βœ… Interior partitions framed throughout the upper living areas
βœ… Stair framing completed between the elevated living levels
βœ… Window and exterior door openings framed to plan
βœ… ZIP System exterior wall sheathing progressing across the building envelope
βœ… Headers, beams, truss connections, blocking, and structural framing components installed throughout
βœ… Open first-floor garage configuration maintained beneath the second- and third-floor living spaces
βœ… Overall structure now clearly defined as framing approaches completion

Current Progress

What began with sitework, foundation construction, CMU structural supports, and elevated floor systems has now developed into a nearly complete three-story framed residence.

The living areas are clearly established, the stair systems are taking shape, engineered roof trusses are in place, and ZIP System sheathing is progressively closing in the exterior walls.

With framing nearing completion, the home’s full scale, room layout, rooflines, elevated design, and architectural character can now be seen throughout the structure.

Next Up

Complete the remaining framing details and blocking, finish ZIP System exterior sheathing, complete roof decking/sheathing, prepare for framing inspection, and advance into the dry-in phase.

The project is now transitioning from major structural framing toward a fully enclosed custom home.

BUILT RIGHT. WORTH MORE.

🌐 https://axiaconst.com/
πŸ“ž (813) 434-3107 | πŸ›‘οΈ License

🚧 NOW HIRING: CONSTRUCTION LABORER 🚧AXIA Construction is growing, and we’re looking for a dependable, hardworking Constr...
09/17/2026

🚧 NOW HIRING: CONSTRUCTION LABORER 🚧

AXIA Construction is growing, and we’re looking for a dependable, hardworking Construction Laborer to join our team in the Tampa Bay area.

We’re looking for someone who:

β€’ Is reliable and ready to work
β€’ Takes jobsite safety seriously
β€’ Works well as part of a team
β€’ Can assist with window installation and general jobsite support
β€’ Has a strong work ethic and takes pride in doing the job right

If you’re ready to work hard, learn, and grow with a professional construction company, we want to hear from you.

πŸ“§ Send your resume to: [email protected]
πŸ“ž Call: (813) 434-3107
🌐 AXIACONST.COM

Join the AXIA Construction team.

BUILT RIGHT. WORTH MORE.

09/11/2026

Today, we remember the lives lost on September 11, 2001. πŸ•―οΈWe honor the courage of the first responders and heroes who answered the call and recognize the strength of a nation that stood together in the face of tragedy. β€οΈπŸ€πŸ’™

May we never forget the sacrifices made, the families forever impacted, and the unity that followed. πŸ™

We remember. We honor. We will never forget. πŸ‡ΊπŸ‡Έ

#911

09/07/2026

Happy Labor Day from AXIA Construction. πŸ‡ΊπŸ‡Έ

BUILT RIGHT. WORTH MORE.

09/03/2026

✨ Project Spotlight: Three-Story Custom Home β€” Second-Floor Framing & Structural Decking | Phase 3✨

This three-story custom home continues moving vertically as the project transitions from masonry construction into structural wood framing. With the first-floor CMU support system complete, the framing package is now creating the elevated living space above the open garage.

The design calls for an open garage at ground level with the second and third floors dedicated to living space, making proper structural sequencing especially important as loads transfer through the elevated floor system to the masonry columns below.

Progress Highlights

βœ… Engineered wood floor framing installed over the open first-floor garage
βœ… Structural beams and floor trusses set across the completed CMU support columns
βœ… Second-floor structural subfloor decking installed, establishing the next level of the home
βœ… Second-floor exterior wall framing underway with window and door openings incorporated into the layout
βœ… Framing continues to define the elevated residential floor plan while maintaining the open garage configuration below
βœ… Materials staged for continued vertical framing as the structure progresses toward the third floor

Current Progress

The transition from block construction to wood framing marks a major milestone on this build. What was previously a series of structural CMU columns is now supporting a complete engineered floor system, creating the platform for the home's first level of living space.

With second-floor decking in place and exterior walls beginning to rise, the scale and layout of the three-story home are becoming much more visible.

Next Up

Complete second-floor wall framing, continue structural openings and connections, and begin the framing system for the third-floor living space as the home continues moving upward.

A multi-story build depends on every phase working with the one below itβ€”from the foundation and CMU columns to the engineered floor system and vertical framing above. Careful layout, structural coordination, and proper sequencing are what keep the entire structure aligned from the ground up.

BUILT RIGHT. WORTH MORE.

🌐 https://axiaconst.com/
πŸ“ž (813) 434-3107 | πŸ›‘οΈ License

Call now to connect with business.

AXIA is officially up on I-275 at Dale Mabry. πŸ‘€πŸ—οΈA new look for where we’re headed β€” focused on new construction, shell ...
08/30/2026

AXIA is officially up on I-275 at Dale Mabry. πŸ‘€πŸ—οΈ

A new look for where we’re headed β€” focused on new construction, shell construction, home additions, and commercial build-outs throughout Tampa Bay.

BUILT RIGHT. WORTH MORE.

If you’re a builder, developer, architect, or property owner looking for a construction partner who values precision, communication, and quality ex*****on, let’s build something worth more.

πŸ“ I-275 & Dale Mabry Highway
🌐 AXIACONST.COM

🚧 NOW HIRING: CONSTRUCTION LABORER 🚧AXIA Construction is growing, and we’re looking for a dependable, hardworking Constr...
08/14/2026

🚧 NOW HIRING: CONSTRUCTION LABORER 🚧

AXIA Construction is growing, and we’re looking for a dependable, hardworking Construction Laborer to join our team in the Tampa Bay area.

We’re looking for someone who:

πŸ‘‰πŸΌ Is reliable and ready to work
πŸ‘‰πŸΌ Takes jobsite safety seriously
πŸ‘‰πŸΌ Works well as part of a team
πŸ‘‰πŸΌ Can assist with general labor and site support
πŸ‘‰πŸΌ Has a strong work ethic and takes pride in doing things the right way

If you’re looking for an opportunity to work with a growing construction company and become part of the AXIA team, we want to hear from you.

πŸ“ Tampa Bay Area
πŸ“ž Apply Today: (813) 434-3107
🌐 AXIACONST.COM

Join the AXIA Construction team.

08/05/2026

HUD Home Rebuild in Tampa Bay, Florida β€” Framing, Roof Trusses & Sheathing Progress

Every foundation tells a storyβ€”but this one represents a new beginning.

This HUD-supported residential home rebuild is providing a family with a fresh start after losing everything. From a completed foundation to a fully framed structure, this project reflects the progress of rebuilding not just a home, but a future.

Progress Highlights
βœ… Concrete slab completed with plumbing rough-ins installed
βœ… Foundation finished and cured to provide a strong structural base
βœ… Exterior and interior wall framing completed to engineered plans
βœ… Roof trusses installed, defining the home's structure
βœ… Exterior wall and roof sheathing underway as the home moves toward dry-in

Current Progress
βœ… The transformation has been remarkable. What began as an empty slab is now a fully framed home with its structural skeleton in place. Each milestone brings the future homeowners one step closer to a safe, durable, and modern home built to today's construction standards.

Next Up
βœ… Complete exterior sheathing, install the roofing system, windows and doors, and begin the dry-in phase to protect the structure from the elements before interior mechanical trades begin.

Projects like this demonstrate the impact quality construction can have on families and communities. We're honored to help deliver a home that provides stability, security, and the opportunity for a fresh start.

At AXIA Construction, we don't just build homesβ€”we help build new beginnings.

🌐https://axiaconst.com
πŸ“ž(813) 434-3107 | πŸ›‘οΈLicense

07/24/2026

✨ Project Spotlight: Three-Story Custom Home β€” Concrete Slab & CMU Block Completion Phase 2 of 2 ✨

This three-story custom home has advanced from sitework and foundation preparation into full structural progress. With the concrete slab complete and the CMU block work finished, the first-floor structure is now in place and ready for the next stage of construction.

Scope & progress highlights:
βœ… Foundation excavation and underground preparation completed
βœ… Underground plumbing installed prior to the slab pour
βœ… Concrete slab poured, finished, and cured
βœ… CMU structural columns and wall sections completed
βœ… Open first-floor garage layout established
βœ… First-level masonry structure completed in preparation for the elevated living areas above

Next up: setting the floor trusses and beginning the framing phase for the second- and third-floor living areas.

From accurate groundwork to completed structural masonry, every phase must be executed in the proper sequence to keep the build moving safely and efficiently.

At AXIA Construction, it’s the details that make the difference.

🌐 https://axiaconst.com
πŸ“ž (813) 434-3107 | πŸ›‘οΈ License

Address

Tampa, FL
33629

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm

Alerts

Be the first to know and let us send you an email when AXIA Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share