Becho Incorporated

Becho Incorporated Becho [be-(ˌ)kō] can provide engineers, equipment and knows-how to better serve your company needs.

Thank you Dave Moody for sharing many years of knowledge, guidance, and leadership in the drilling industry. You will be...
03/01/2024

Thank you Dave Moody for sharing many years of knowledge, guidance, and leadership in the drilling industry. You will be missed but not forgotten. Congratulations on your well deserved retirement!

Excavating for the 2nd row of struts on the Southwest Green Line secant piles, Minneapolis, MNTutor Perini Corporation  ...
07/06/2023

Excavating for the 2nd row of struts on the Southwest Green Line secant piles, Minneapolis, MN

Tutor Perini Corporation

Starting the 2nd row of tie backs at the Purple Line Section 3 VA Station, Los Angeles. There will be 7 rows with a tota...
06/26/2023

Starting the 2nd row of tie backs at the Purple Line Section 3 VA Station, Los Angeles. There will be 7 rows with a total excavation of 90 feet. A new subway station before the 2028 Olympics.

Tutor Perini Corporation

3 rows of soil nails and 1 row of permanent tie backs at Tulare Ave at the High Speed Rail           Tutor Perini Corpor...
06/20/2023

3 rows of soil nails and 1 row of permanent tie backs at Tulare Ave at the High Speed Rail

Tutor Perini Corporation

Installing over 1000 IPB Piles at the California High Speed Rail in Fresno.           Tutor Perini Corporation          ...
06/09/2023

Installing over 1000 IPB Piles at the California High Speed Rail in Fresno.

Tutor Perini Corporation

06/02/2023
Alex Der Movesesian is a current Junior student at Cal State Northridge majoring in Civil Engineering. He is our summer ...
06/02/2023

Alex Der Movesesian is a current Junior student at Cal State Northridge majoring in Civil Engineering. He is our summer field engineer intern at the Purple Line Section 3 in Los Angeles. He is providing quality control which includes testing tiebacks and taking grout densities.

The Purple Line Section 3 VA station with a 35 foot excavation. The head wall is approximately 15’ from the 405 freeway....
05/24/2023

The Purple Line Section 3 VA station with a 35 foot excavation. The head wall is approximately 15’ from the 405 freeway.

Tutor Perini Corporation

Using an uncoiler to assist installation of an 80’ long tiebacks at the Westside Purple Line Extension Project, Section ...
05/23/2023

Using an uncoiler to assist installation of an 80’ long tiebacks at the Westside Purple Line Extension Project, Section 3 VA Station Los Angeles, CA

Tutor Perini Corporation

Getting started with tiebacks for Metro Los Angeles at the Westside Purple Line Extension Project, Section 3 VA Station ...
05/22/2023

Getting started with tiebacks for Metro Los Angeles at the Westside Purple Line Extension Project, Section 3 VA Station Los Angeles

Tutor Perini Corporation

Grade separation at Tulare avenue at the High Speed Rail. Completed the first row of soil nails out of 6.           Tuto...
05/16/2023

Grade separation at Tulare avenue at the High Speed Rail. Completed the first row of soil nails out of 6.

Tutor Perini Corporation

Address

15901 Olden Street
Sylmar, CA
91342

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when Becho Incorporated posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Becho Incorporated:

Share