06/18/2026
Here’s some insight on an upcoming project to commence mid July.
Large composite deck with black aluminum railings. We will install cap lighting on all of the railing posts. Down lighting will be added on all structural posts holding the deck upright. A lower level concrete pad with linear drains will also be added.
In addition, we will a be excavating a large area off the driveway and installing a temporary retaining wall for Phase II of this project .
Phase II will consist of a new foundation once we remove the retaining wall we installed during Phase I. A separate two car garage will be then be added at the end of the driveway looking over the pool area.
Finishing this project, we will install a roof over a portion of the new deck. Ceiling fans and low voltage lighting will complete the project
Follow us for progression photos and thank you for your support.