Making progress after two weeks. Installed retaing wall with geogrid, 4” drains, backfilled and tamped ready for asphalt.
Final grade was completed on this part of project and ready for top soil and seed.
Lower area. Gas, water and electric lines are in along with the main drain for the entire project.
Next, we will be grading pad areas to get ready for concrete , post footings, forms and trough drains.