09/02/2026
Some of the most important work on a project will eventually be hidden from view.
This installation is part of the electrical distribution system within the garage of a 292-unit high-density multifamily project in Austin. The garage electrical services were designed to support the overall parking infrastructure, including significant EV-ready requirements, which added complexity to service sizing, feeder and conduit pathways, distribution panels, and coordination throughout the project.
Before these conduit runs could be installed, teams had to review plans, coordinate routing around structural conditions and other trades, and plan the bends and supports needed to keep the system organized.
The finished installation shows the craftsmanship. The planning and coordination behind it are what make it possible.
That is the work behind the work.