10/02/2026
This project we have added onto the lean to roof, installed the metal roofing, installed the handrail for the stairs for the slide, rough graded, landscaped, finish graded and installed sod on the front of the pool. We will be Hydroseeding the other sides next week. We are thankful for clients that trust our vision from the start to finish!Give MLT Contracting, LLC a call for your project!