07/24/2025
We been busy draining ponds, rebuilding the storm drains and waterfall at Hampton woods Shawnee. Last few weeks of rain has been a challenge. But we have the new electric service, pipe and 80% of the concrete done. Now we just need to finish another pour, epoxy, asphalt and set pumps and pump lines. Then install decorative rock and landscape. Hope to be be done in 3 weeks.