01/13/2026
Check out this recent project we spotlighted in our latest newsletter! This hall bath in Chesterbrook was tired and dated. We completed a gut renovation of the space, as designed by a local architect and designer. The new tub and tile surround, tile floor, vanity and fixtures have a modern, clean aesthetic, but it’s what you don’t see that’s most important: beneath the floor tile there is now a sturdy, level sub-floor, whereas before the sub-floor was almost 2” out of level, and had too much deflection to accommodate large format tiles. And behind the shower tile is a fully waterproof tile substrate that will prevent leaks, mold growth, or any type of deterioration to the surrounding structure, ensuring that the newly renovated space will hold up for decades.