03/14/2026
Main Entryway build. Winter '25-'26
Removed old entry door and framed into a wider opening to the house.
Built closet, installed drywall, spackled and painted.
Installed herringbone tile floor.
Stained installed tongue and groove ceilings with solid faux beam and rafters.
Built and stained closet cubbies.
Stained and installed bifold barn style closet doors.
Shiplap wall with bench made from wood slab, with shoe cubbies underneath.