10/15/2026
Got the gable re-framed. Yes one side has double studs, the left side of the roof was buckling, so I had to do some jacking etc. Sank 6" lags through top plate into the LVL header. Got string line ready on the mudroom roof side we have to finish.
Stopped in Sidney Center/Masonville to look at a small paint job for this Saturday, let my daughter bang that out so she can make some spending money/gas money. That might lead into a smaller new build tiny home to replace one of the manufactured homes they had to take down.
He also had Alpine Metal Roofing do his roof and it's leaking, in multiple spots. That's not cool, but stuff happens. I'll check all the screws for over tightened screws, hit the seams with sealant etc, but that won't be this weekend.
These little jobs I would've been passing down the line to a laborer, but yeah, I don't have one of those cuz " ima pot head loser and could keep workers if i wasnt a pot smoking loser" bahahaha, smoke and would spin circles all day every day around these lazy kids now days bahahaha (no its cuz i dont let lazy pieces of s***e work for me), so letting baby girl get in on the action. She is better and more knowledgeable then dudes her age, has more drive and a better work ethic (Thanks to Dad).
No Work tomorrow at current site due to weather, I could go do some inside work for a few hours, but ima take a personal day and lounge like a king 🤴 😌 😎.