09/02/2026
💧SOLUTIONS💧When the homeowner saw the pavers meeting the low point of the preexisting concrete they had some questions! Up front we told them we had to set our grade based on what was there and that their concrete from one side to the other had a 5” inch slope. But they didn’t quite understand what the end result would look like. Now that they understand we gave them a few options to change the grade. They chose to take out concrete and add 11 additional feet of pavers. They have a lot of concrete so besides smoothing out the grade I think it will break things and make the pool feel more expansive. Stay tuned!