Posting the 3 pictures of the finished deck that Aunt Kiery and Dad refurbished.   The back ordered railings came in. An...
10/09/2026

Posting the 3 pictures of the finished deck that Aunt Kiery and Dad refurbished.
The back ordered railings came in. And Dad picked them up this morning. Took a couple hours to install them and the solar caps that the clients wanted.
It looks nice. And is now safe.

Kiery and dad put a few hours in on this deck today. They would have finished except the 8ft stair rails were back order...
10/05/2026

Kiery and dad put a few hours in on this deck today. They would have finished except the 8ft stair rails were back ordered. And the one bottom rail was damaged when dad opened it. We don't install damaged parts.
So we'll get those all installed when they come in.
Otherwise the project is completed.

Day two of this deck project. Aunt Kiery got the rest of the water logged wood from the lower platform cut up and hauled...
10/01/2026

Day two of this deck project.
Aunt Kiery got the rest of the water logged wood from the lower platform cut up and hauled around the house to the dumpster.
Dad was able to jack up and level the existing frame. Also he cut the stair horses and they installed them. He painted the sleeves that he bent to cover the holes where the old railings were fastened to the walls and Kiery slid them in place.
Then he cut decking while Kiery installed it. He also cut the material for the stair risers and treads.
Sadly rain is predicted all day tomorrow. So they will have to wrap it up Monday.

Dad and Kiery started another deck project today.  Today they did all of the demo. Just a little to carry up around to t...
09/30/2026

Dad and Kiery started another deck project today.
Today they did all of the demo. Just a little to carry up around to the dumpster in the morning.
Tomorrow Dad is going to raise the beam and level out the frame ready for new decking, cut the horses, and build the new stair system.
Kiery will be laying the new decking and screwing it down.

We are currently taking appointments to run estimates for remodels. If you have been thinking about updating or complete...
09/22/2026

We are currently taking appointments to run estimates for remodels. If you have been thinking about updating or completely changing the look of your home, this is a good time to have us take a look. Here are a few projects we have had the pleasure of working on:

Aunt Kiery and Dad knocked out two jobs today.   They were both next to each other. One was to revitalize a small deck. ...
09/16/2026

Aunt Kiery and Dad knocked out two jobs today.
They were both next to each other. One was to revitalize a small deck. And the other was to pull up four existing mailboxes. Build what Dad refers to as a hitching rail with five new boxes on it.
They accomplished both jobs in a day.

Pictures below.

The heat, unrelenting sun, and humidity just about kicked our butts on this latest deck job!  But Dad and Aunt Kiery got...
09/10/2026

The heat, unrelenting sun, and humidity just about kicked our butts on this latest deck job!
But Dad and Aunt Kiery got er done! Just had to adapt with more breaks, loads of cold liquids, and shorter days.
Today we wrapped up this good looking and solid deck job!
We had to double the number of joists and add a bunch of blocking before we could install the new decking.
We also rebuilt the front step of the house. Taking them from extremely dangerous to less steep and solid.
(From two existing horses and rocks to 7 solid horses with 6 1/2 inch risers and 11 inch treads )

Today had some showers. But we were able to work without heat/sun stroke.  Kiery and Dad were able to get the framing do...
09/04/2026

Today had some showers. But we were able to work without heat/sun stroke.
Kiery and Dad were able to get the framing done to make this deck a safe one. They added more joists to be 16" on center. Then added blocking to cause all of the joists to work together.
It was interesting that some of the existing joists sagged more than an inch and a quarter. So they moved a couple around and sistered them together to level and strengthen them.
Also they worked to plumb up the remaining posts so the new railing will look right since we are using some of the existing posts as subposts.

A few photos from today.

Already had the railings off when I took these pictures.  And I didnt get shots after the decking was all off.  Kiery & ...
09/02/2026

Already had the railings off when I took these pictures.
And I didnt get shots after the decking was all off.
Kiery & Dad worked slow today as it was in the mid 90's no shade, little to no breeze, and very high humidity. It was a fight to keep going.
When we started to remove the old 5/4 wood decking we found that it was not framed very well. So we had a trip to get a stack of 2x8s for added joists. And a bunch of needed joist hangers.
When the frame has been upgraded the joists will be 16 inches on center to propperly accomodate 5/4 decking, will have propper joist hangers and blocking installed.
This will be a solid built and safe deck. And last for years.
Day one cut short by the heat.

Address

Seville, OH

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5am
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+13303276389

Alerts

Be the first to know and let us send you an email when Building with Carpenter Aunts LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Building with Carpenter Aunts LTD:

Shortcuts

Share

Category