10/10/2026
Here’s a look at the before, during, and after of this rot repair with Anderson Builders.
Before: Removing the shingles and trim revealed extensive rot in the framing around the garage opening and along the walls.
During: We installed temporary supports, removed damaged lumber, and rebuilt the affected framing with new headers, posts, and studs. We also replaced insulation and repaired the wall sheathing.
After: The repaired areas are now covered with a new weather barrier and ready for siding and trim. There’s still finish work ahead, but these photos show the substantial work that goes into repairing what’s underneath.
Proud of our crew for tackling this one with care! 💪