09/03/2026
🔨 For the age of this home, the existing structure was actually in pretty good condition. There were still areas that needed some attention, so we repaired and reinforced the framing where necessary, sistered floor joists where needed, and installed new subfloor on both floors.
We also spent time making sure the walls were flat, straight, and plumb before moving forward. Since this home got a Level 4 smooth drywall finish, getting the framing right beforehand is important. A good finished product starts with what’s behind the walls.
This video doesn’t show every stage of the project, but since then the electrical, plumbing, and insulation work was completed
Now we’re ready for the next stage — DRYWALL! đźŹ
Stay tuned for the next update!
RB1 Construction LLC
Sedalia, Missouri