Steelkorr

Steelkorr Seattle based steel erection and field services firm
Structural Steel
Miscellaneous Steel
Precast
Ornamental Metals

Supply Erect Install Cantilever Arch Stair at Colman Ferry Dock.   πŸ‡ΊπŸ‡Έ  πŸ‡ΊπŸ‡Έ
07/20/2022

Supply Erect Install Cantilever Arch Stair at Colman Ferry Dock.



πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ

One Call Does It All ✊🏽πŸ”₯  πŸ”₯ πŸ”₯ πŸ”₯ πŸ‡ΊπŸ‡Έ  πŸ‡ΊπŸ‡Έ
05/03/2022

One Call Does It All ✊🏽
πŸ”₯
πŸ”₯
πŸ”₯
πŸ”₯
πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ

OWSJ Erect/Install  It's Monday!! let's get it people!!!
04/25/2022

OWSJ Erect/Install It's Monday!! let's get it people!!!





Union St Bridge Project Elevator Tower Install
04/20/2022

Union St Bridge Project Elevator Tower Install



Steel stringer and railing system supply and install at University of Washington Founders Hall.
02/02/2022

Steel stringer and railing system supply and install at University of Washington Founders Hall.



11/12/2021




Union Street Pedestrian Bridge is being constructed to provide a new east-west connection from the Seattle Waterfront to the downtown core. V+M Structural Design…

Another day on the grind.
08/26/2020

Another day on the grind.



E360 Sound Transit Light Rail Station Ped Bridge Section Westbound 520 Second Sequence Erect Install with Grove 550 Cran...
05/31/2020

E360 Sound Transit Light Rail Station Ped Bridge Section Westbound 520 Second Sequence Erect Install with Grove 550 Crane




πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ
Follow on IG and FB✊

E360 Sound Transit Light Rail Ped Bridge Eastbound 520 Test Pick and Dolly Loading.   πŸ‡ΊπŸ‡ΈπŸ‡ΊπŸ‡Έ       Follow  on IG and FB to...
05/29/2020

E360 Sound Transit Light Rail Ped Bridge Eastbound 520 Test Pick and Dolly Loading.

πŸ‡ΊπŸ‡ΈπŸ‡ΊπŸ‡Έ





Follow on IG and FB to see all the rad things we do!! ✊✊

E360 ST Light Rail Station Ped Bridge Westbound 520 Section. (Access and Egress for Microsoft Campus).  Pick/550 Hydro C...
05/17/2020

E360 ST Light Rail Station Ped Bridge Westbound 520 Section.
(Access and Egress for Microsoft Campus).
Pick/550 Hydro Crane
πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ
πŸ‡ΊπŸ‡Έ

FOLLOW on IG and FB and see all the cool rad stuff WE BUILD AND ERECT!!

E360 Sound Transit Light Rail Station Bridge westbound sequence completed and ready for hoisting.                       ...
03/06/2020

E360 Sound Transit Light Rail Station Bridge westbound sequence completed and ready for hoisting.

E360 Light Rail Station Bridge First sequence section truss build that will span over Hwy 520 westbound traffic lanes.  ...
02/25/2020

E360 Light Rail Station Bridge
First sequence section truss build that will span over Hwy 520 westbound traffic lanes.

Address

Seattle, WA

Alerts

Be the first to know and let us send you an email when Steelkorr posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Steelkorr:

Share