Complete Utilities, LLC

Complete Utilities, LLC Water & Sewer Contractor
Based in Scranton, SC

Project Complete πŸš§πŸ‘·πŸ¦ΊπŸšœIt was a pleasure working with CR Jackson, Inc. on this large infrastructure investment.
02/18/2025

Project Complete πŸš§πŸ‘·πŸ¦ΊπŸšœ

It was a pleasure working with CR Jackson, Inc. on this large infrastructure investment.

09/23/2024

Attention!

The City of Florence would like to notify customers of scheduled maintenance along Old Marion Highway at Ashby Road, starting Wednesday, September 25, at 9:00 pm, and along North Williston Road, starting Thursday, September 26, at 9:00 pm. Affected customers in these areas may experience low water pressure or service disruptions during these times as necessary maintenance is conducted.

Click here to read the full press release: https://www.cityofflorence.com/news/scheduled-water-service-maintenance-beginning-wednesday-september-25th-900-pm

08/26/2024

Two thumbs up from our buddy Doc with Complete Utilities, LLC! We hope you enjoy your new Cat 325!!

09/28/2023

*****Complete Utilities, LLC is HIRING*****

We are HIRING for the following positions:

HEAVY EQUIPMENT OPERATOR
-Must have a minimum 5 years experience operating equipment not limited to excavators, bull dozers & backhoes.
-Must be able to read job plans.
-Understand slope and grade.
-Must be able to use hand tools and small equipment.
-Must be able to and comply with safety regulations while operating heavy equipment.
-Must have a valid drivers license and be able to work weekends and overtime.
-Experience in water/sewer construction is PREFERRED.
-PAY DEPENDENT UPON EXPERIENCE.

PIPELAYER
-Must have experience laying water/sewer lines.
-Must have a valid drivers license and be able to work weekends and overtime.
-PAY DEPENDENT UPON EXPERIENCE.

PLEASE MESSAGE RESUMES AND/OR WORK EXPERIENCE ALONG WITH REFERENCES TO THIS PAGE.

02/25/2023

complete-utilities's short video with ♬ Way down We Go

07/21/2022

For Immediate Release – July 21, 2022Media Contact:Michael Hemingway, Utilities Director – 843-665-3236 or [email protected], SC – In order to complete necessary water system utility work associated with the Alligator Road Highway Widening Project Phase II, the City of Flo...

08/26/2021

For Immediate Release – August 26, 2021Planned Water Outage to Occur as part of the Alligator Road Highway Widening Phase IIMedia Contacts:Michael Hemingway, Utilities Director – 843-665-3236 or [email protected] Osterman, City Manager – 843-665-3113 or rosterman@cityoffloren...

08/12/2019

*****Complete Utilities, LLC is HIRING*****

We are HIRING for the following position:

GENERAL LABORER
-Experience laying water/sewer lines or job site-work preferred.
-Must have reliable transportation to and from work.
-Must be able to work weekends and overtime.
-PAY DEPENDENT UPON EXPERIENCE.

APPLY IN PERSON TO GRAHAM OR FRANKIE ON ALLIGATOR ROAD JOBSITE IN FLORENCE, SC.

Address

1671 McKnight Road
Scranton, SC
29591

Alerts

Be the first to know and let us send you an email when Complete Utilities, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share