Main Cheese Builds

Main Cheese Builds Follow my journey as I build high-end custom homes in Scottsdale and Paradise Valley, Arizona.

04/12/2023

Finishing up the coping, waterline tile and the hot tub steps!

Basic closet for the guest bedroom.  MDF and will get a lacquer finish to make it shiny!                                ...
04/05/2023

Basic closet for the guest bedroom. MDF and will get a lacquer finish to make it shiny!

03/29/2023

Black trim and doors are the latest design trim - satisfying to watch it going on, but so HARD to keep it clean!

The metal roof is finally finished. This standing seam metal roof is lighter and can be installed anytime. You do not ha...
03/20/2023

The metal roof is finally finished. This standing seam metal roof is lighter and can be installed anytime. You do not have to wait for roof tiles to sit after installing windows.

How to get water to a detached RV garage - the red plastic is a protective sleeve on the copper piping.                 ...
03/13/2023

How to get water to a detached RV garage - the red plastic is a protective sleeve on the copper piping.

03/10/2023

Another day of dry wall install - top first then work your way down.

They are finishing up the water line tile and coping on this soon-to-be beautiful pool!                                 ...
03/08/2023

They are finishing up the water line tile and coping on this soon-to-be beautiful pool!

Drywall install - you install from the top down - 1/2 way there!
03/06/2023

Drywall install - you install from the top down - 1/2 way there!

Deciding which way to lay the siding on the trim of this garage!  Custom works take time.....                           ...
03/03/2023

Deciding which way to lay the siding on the trim of this garage! Custom works take time.....

Drone shots - roof tiles are loaded and windows are next!
03/01/2023

Drone shots - roof tiles are loaded and windows are next!

Building this sweet BBQ with a huge hood vent with an automatic drop-down TV in front!                                  ...
02/27/2023

Building this sweet BBQ with a huge hood vent with an automatic drop-down TV in front!

Priming the walls and spraying window frames before paint and trim!
02/24/2023

Priming the walls and spraying window frames before paint and trim!

Address

Scottsdale, AZ
85253

Website

Alerts

Be the first to know and let us send you an email when Main Cheese Builds posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category