10/20/2026
Thinking about renovating your home in 2027? The time to start planning might be sooner than you think.
Between design, architectural drawings, engineering, selections, and permitting, the preconstruction process can take 3–6 months or longer, depending on the project.
The best renovations don’t start with demolition. They start with a plan.
Construction starts with a conversation.
KC KREW | Design. Build. Renovate. 🐉