Gordon Contracting Inc

Call Directions Website

Gordon Contracting Inc Heavy/Civil Constructor located in central Maine specializing in Highway, Bridge and infrastructure.

The view from our office is pretty hard to beat sometimes.  Bangor International Airport📸 Jason Morse Sr.
10/21/2026

The view from our office is pretty hard to beat sometimes. Bangor International Airport

📸 Jason Morse Sr.

In just 3 months; Joseph and his crew returned the Carter Bridge in Waterville to two-way traffic.  Milling, paving, new...
10/16/2026

In just 3 months; Joseph and his crew returned the Carter Bridge in Waterville to two-way traffic. Milling, paving, new bridge joints, deck repairs, membrane and other critical repairs were performed.

88% of this project was self performed by Gordon team members. This high self-performance factor allows us to drive and dictate construction schedules and deliver projects FASTER 🏁

Minor work still remains; however, we are back to two-way traffic in Waterville.
Thanks for your patience.

Great job crew!

📷 Kamden

Gordon Contracting has been selected by the City of Bangor to reconstruct a section of the Kenduskeag Steam retaining wa...
10/15/2026

Gordon Contracting has been selected by the City of Bangor to reconstruct a section of the Kenduskeag Steam retaining wall, located in Bangor’s downtown.

Our method of construction, history of successful in-water work, and excellent performance with the City were all factors in awarding to Gordon.

We look forward to another collaboration with the City and their engineering department. As always when construction begins we will strive to minimize the overall duration to reduce impacts for area businesses and residents.

Thanks Bangor!

We heard that the track team at Dexter High school were bussing to another school to run their track for track practice....
10/12/2026

We heard that the track team at Dexter High school were bussing to another school to run their track for track practice.

We’re gonna fix that 💪

Thanks for reaching out Adam, Steve and Frank.

ABBOT to GREENVILLE Highway Reconstruction:As this $25.5 million construction contract comes to a close; I would like to...
10/01/2026

ABBOT to GREENVILLE Highway Reconstruction:

As this $25.5 million construction contract comes to a close; I would like to recognize those who made it possible. MaineDOT administered the contract which was heavily supported and funded thanks to U.S. Senator Susan Collins office. This project employed hundreds of craft workers for 2 construction seasons and transformed the Moosehead Trail from a daunting journey into an enjoyable ride.

The project was managed by Site Super Nick Schmiedlehner (an Abbot Native), Project Manager Drew Straehle of Dover, project Foreman Alec Oelschlegel of Greenville. The paving foreman Jason Morse had countless 1600-2000 ton days of production which lead to a very fast turnover, with ride test results that put Gordon in a project ride bonus. The majority of our workers live in Piscataquis County, which brings a great level of pride for everyone involved.

-This is our home.

The project was delivered on time, with 25 days remaining under contract to complete our remaining punch list items.

Thoughtful planning nearly 18 months ago allowed us to complete this 24 mile project in about 200 days of construction.

I’m incredibly thankful for the crew that worked so hard to deliver this project for our neighbors, and local taxpayers.

Our subcontractors;
Withee Materials Testing
CA Newcomb: Guardrail
Fineline Striping: Line Striping
Allstate’s Construction- roadway Recycling
CNC- Sweeping
SuperiorConstruction- Recreational Crossings
Shawn Thyng Paving- Hand paving
Project Flagging- Flagging
Vortex- Basins
Trucking- BFP, Burgoin, Cleaves, Swihart, Duggan, S Hanscom, Burleigh, B+B, Hopkins, T-S Lee, Northill, Josh Smith, Rollins, Solon Express, R+R, In-Phase, Charco, Zitaner, Mason Lee, Family Affair, Roderick, Paradis and others.

Gordon Staff:

Alec O
Nick S
Kyle C
Tanyon G
Kyle P
Jake S
Chris C
Justin E
Cam M
Isaac A
Kurt G
Ethan S
Randy C
Scott M
Scott R
Kelly J
Charles A
Wade F
Scotty M
Eric C
Jason M Sr
Jason M Jr
Joey F
Nick R
Matt M
Greg F
Blake F
Jeremy B
Colin C
Greg D
Greg D
Paul R
Dan M
Derek S
Brandon B
Grant H
Travis B
Chris S
Drew S
Kemar N
Keville P
Marlon S

It takes a team to deliver a project like this and we have the best.
Thanks to everyone who endured the stop and go traffic and the daily lane closures.

The crew flipped another phase AHEAD of schedule at the Bangor International Airport.  8186 TONS of pavement placed this...
08/28/2026

The crew flipped another phase AHEAD of schedule at the Bangor International Airport. 8186 TONS of pavement placed this week by the paving crew in Bangor and Greenville.
Have a great weekend everyone.

Noyes Bridge Replacment -Cumberland 202618 working daysMaineDOT Bridge ProgramMagnitude $ 1.4mm
08/28/2026

Noyes Bridge Replacment -Cumberland 2026
18 working days
MaineDOT Bridge Program
Magnitude $ 1.4mm

Address

627 N Dexter Road
Sangerville, ME
04479

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+12078763798

Alerts

Be the first to know and let us send you an email when Gordon Contracting Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share