04/28/2026
π·ββοΈπOur construction team at the Vineyard Groundwater Polishing Plant really came together to accomplish something great. This was a complex project that involved simultaneous construction of multiple buildings. Check the link below for a full breakdown.
https://www.gslelectric.com/gslcc-vineyard