06/05/2026
Posting some phase I bridge abutment torque down pile driving (or screwing) progress photos of the Bermuda Drive bridge replacement for the City of San Mateo. Yes, heavy walled 18” steel pipe piles torsionally screwed into the earth with amazing hydraulic equipment courtesy of specialty subcontractor, Foundation Constructors.
Structure concrete abutment and bridge concrete on deck for this summer!