06/27/2026
This absolute monster is finally wrapped up! All the concrete you see in this video was done by us here at Pacific Concrete and Engineering. This was a project we were fortunate enough to be a part of at Castle Park High School. This project consisted of the new build foundation for the 900 building including the classrooms upstairs and catwalk, topcast finish seat walls, standard grey flatwork concrete, coal colored flatwork concrete, structural caissons for shade structures and light poles, and a stage. Not pictured is also a ramp at the front of the school. We’re extremely proud of our team for the effort that was put in on this and looking forward to hopefully doing any other one!