06/03/2026
Engineering for compliance. Delivering under pressure.
Romtec Utilities provided a complete leachate lift station package for the Keystone Sanitary Landfill in Dunmore, PA, designed to meet strict Pennsylvania DEP requirements ahead of an April 2025 deadline.
This project required:
Integration with pre-purchased pumps and VFDs
Coordination with third-party SCADA integration (Enertech)
A compact design to fit within existing treatment infrastructure
System highlights:
900-gallon active volume wet well
Two 400 GPM pumps at 160.2 TDH
Remote I/O panel with surge protection, phase monitoring, and level sensing
NSF/ANSI 61-compliant components throughout
The result: a high-capacity, fully integrated solution built for long-term leachate management and regulatory compliance.
Explore the full system: https://na2.hubs.ly/H05S3rL0