08/24/2026
๐๏ธ Plan the access before the project reaches the field.
High-rise construction in NYC requires more than selecting a hoist.
Hoist location, floor access, sidewalk protection and site logistics all have to work together.
At Dynamic Hoisting & Scaffolding (DHS), 3D planning helps us visualize those conditions before mobilization โ so potential access conflicts can be identified earlier and the right solution can move toward estimating and ex*****on.
This model shows a dual-hoist access strategy integrated with the building and street-level protection system.
Have a project coming up in NYC?
๐ Send us your drawings for review.
โ๏ธ [email protected]
๐ (917) 444-2160 โ Daniel Chirila
Dynamic Hoisting & Scaffolding
Hoisting โข Scaffolding โข Sidewalk Protection โข Temporary Access