MKM & Associates, Structural Engineering

Directions Website Contact the business

MKM & Associates, Structural Engineering In today's challenging environments, MKM brings experience and expertise to all of our projects.

We are proud to announce that the Foley Family Community Pavilion in Healdsburg has received the Outstanding Historical ...
10/12/2026

We are proud to announce that the Foley Family Community Pavilion in Healdsburg has received the Outstanding Historical Renovation Project Award from the ASCE Redwood Empire Branch!

Originally constructed in 1922, the historic Cerri Building was once slated for demolition before being reimagined as a vibrant community gathering space. Through thoughtful adaptive reuse, the project preserved the building’s historic character, including its exposed roof trusses, concrete loading platform, and iconic façade, while introducing modern architectural elements and improved accessibility.

Today, the pavilion serves as the permanent home of the Healdsburg Farmers’ Market and hosts concerts, festivals, and community events year-round. We are honored to have contributed to a project that celebrates Healdsburg’s history while creating a lasting space for its future.

Congratulations to the entire project team!

Owner | City of Healdsburg
Architect | TLCD Architecture
Structural Engineer | MKM Structural Engineering
Contractor | Wright Contracting

Set along a coastal bluff overlooking Bodega Bay, this compact 727-square-foot residence turns a challenging site into o...
09/21/2026

Set along a coastal bluff overlooking Bodega Bay, this compact 727-square-foot residence turns a challenging site into one of the defining elements of the design. With limited access, steep terrain, and the bay directly below, the structure was shaped around the landscape rather than imposed on it.

The foundation and site work relied heavily on drilled, cast-in-place concrete piers, including soldier-pile retaining walls that helped establish a workable building platform along the slope. Above, the main floor was framed with steel beams extending dramatically toward the water, creating a long cantilevered portion of the residence and supporting an exterior deck oriented toward the harbor. The steel backspan was anchored into the hillside with additional concrete pier support and mass to balance the structure.

It’s a project where architecture, structure, and constructability came together at every stage. From the retaining walls and deep foundations to the cantilevered steel framing, the finished home reflects close collaboration between MKM, the project architects, builders, and broader project team to create something that feels both carefully engineered and completely at home on the Northern California coast.

Featured in The New York Times 📰

Architect / S^A | SchwartzandArchitecture
Builder / Fairweather + Associates gabecheesecarpentry
Land, Civil / Hogan Land Services

  — A look back at construction of Whole Foods Market at Coddingtown in Santa Rosa. During construction, major structura...
08/28/2026

— A look back at construction of Whole Foods Market at Coddingtown in Santa Rosa.

During construction, major structural components were lifted and carefully set into positions as the nearly 50,000 square foot market took shape. The project incorporated prefabricated light-gauge steel exterior wall systems and required close coordination between structural design, fabrication, and field installation.

Completed in 2010, the new Whole Foods became an important part of the redevelopment of Coddingtown’s north side and its unique roof design remains recognizable today.

In construction. Two-story ADU and garage pairs exposed 4x rafters, ridge beam framing, wood I-joists, cantilevered stee...
08/26/2026

In construction. Two-story ADU and garage pairs exposed 4x rafters, ridge beam framing, wood I-joists, cantilevered steel beams, and a waterproof deck with concrete retaining walls anchoring the lower level into the site.

Adjacent to the ADU, a new rec room overlooking an existing pickleball court continues the same material language, with exposed roof framing, wood and concrete construction, and an elevated deck supported on piers along the steep slope. Together, the spaces are designed to feel intentional, open, and seamlessly integrated into the surrounding property.

This extraordinary residential build combines architectural and engineering complexity, with thoughtful consideration gi...
08/24/2026

This extraordinary residential build combines architectural and engineering complexity, with thoughtful consideration given to its unique hillside setting in Bodega Bay. In collaboration with S^A | SchwartzandArchitecture, featured in The New York Times 🌊

Special shout out to the entire team - Fairweather + Associates Hogan Land Services gabecheesecarpentry

New project in bloom w/ ironvineconstruction | Garage/shop and ADU build in rural Sebastopol.
08/20/2026

New project in bloom w/ ironvineconstruction | Garage/shop and ADU build in rural Sebastopol.


We’re excited and honored to be recognized as one of the North Bay Business Journal's 'Best Places to Work' for the 8th ...
08/15/2026

We’re excited and honored to be recognized as one of the North Bay Business Journal's 'Best Places to Work' for the 8th year in a row, as well as a recipient of the 'Best of the North Bay Gold Award' from NorthBay biz magazine!

Thank you to our incredible staff, clients, partners, friends, and community for making this recognition possible. At MKM, our work has always been about more than designing structures. It’s about strengthening our communities, helping rebuild after disasters, supporting meaningful growth, and creating a positive impact through the work we do.

Press Democrat

Duchamp Healdsburg details
08/14/2026

Duchamp Healdsburg details




New construction in Alexander Valley. Fire resistant home designed with ICF blocks. In collaboration with M A D architec...
08/11/2026

New construction in Alexander Valley. Fire resistant home designed with ICF blocks. In collaboration with M A D architecture

Precast commercial office and warehouse space coming together in Windsor, CA. In collaboration with Harkey Construction ...
08/05/2026

Precast commercial office and warehouse space coming together in Windsor, CA. In collaboration with Harkey Construction Inc.

Address

5880 Commerce Boulevard , Suite 105
Rohnert Park, CA
94928

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when MKM & Associates, Structural Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MKM & Associates, Structural Engineering:

Shortcuts

Share