10/10/2026
Talk about a tough test drive!
We recently finished installing a brand-new septic system for a customer, only for a neighboring tree to fall directly onto the brand-new Alderon power post pushing it 18 inches into the ground. Talk about some major bad luck!
The silver lining? Check out how that post held up under the full weight of the tree trunk. The green light you see tells us the post is still operational. If you ever doubted the build quality of an Alderon Industries power post, let this be your proof.
It's an unfortunate setback, but don't worry—our team is already on it to get everything completely fixed!