W+J Construction Corp.

W+J Construction Corp. W&J Construction Corporation formed in 1965 is a fully qualified licensed, insured, and bonded General Contractor.

W+J Construction: Building Brevard and Beyond since 1965, a Florida State-Certified General Contractor, specializing in commercial construction. We provide comprehensive design phase and construction phase services under all delivery/contractual methods, including construction management, general contracting and design/build. With over 55 years of experience in Federal and Local Government and Commercial Contracts, we have successfully completed over 1500 projects.

09/30/2026

๐Ÿ’–

09/30/2026

๐Ÿšง ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ ๐—จ๐—ฃ๐——๐—”๐—ง๐—˜ ๐Ÿšง
Farallon Fields Amenity Center - Viera

Superintendent ๐—–๐—ฎ๐˜€๐—ฒ๐˜† ๐—ฅ๐—ฒ๐—ฏ๐—ฒ๐—ป๐˜€๐—ธ๐˜† filled us in on the latest happenings at the new lakefront amenity center for ๐—ง๐—ต๐—ฒ ๐—ฉ๐—ถ๐—ฒ๐—ฟ๐—ฎ ๐—–๐—ผ๐—บ๐—ฝ๐—ฎ๐—ป๐˜†'s Farallon Fields neighborhood in Viera.

Since our last update, all structures have been constructed, roofing is in place and they are in the process of receiving Hardieยฎ siding plank detail. Stucco and then paint will follow for the restroom/picnic pavilion and both mail kiosks. M/E/P rough-ins are taking place in the buildings and the interior is ready for drywall. Electricians are wrapping up the electrical conduit from each pavilion back to the new transformer pad location, connecting the power to each. Site work includes building up the grade of the site using 42 loads of dirt. Stormwater drain pipes and boxes are in place and already helping with site drainage. Flatwork/sidewalks and roadway/curbs will be next.

The ๐—™๐—ฎ๐—ฟ๐—ฎ๐—น๐—น๐—ผ๐—ป ๐—™๐—ถ๐—ฒ๐—น๐—ฑ๐˜€ Amenity Center will consist of a covered restroom/picnic pavilion with drinking fountain, two covered mail kiosks, a 2,640 SF swimming pool with lakefront terrace, fishing pier, tot lot playground, vehicle + golf cart parking, bike racks and landscaping throughout. It is located just to the east of the community model home sales center, for the enjoyment of Farallon Fields residents.

Make sure you're following us on Facebook, Instagram, LinkedIn and YouTube to watch this neighborhood amenity take shape. @๐˜„๐—ท๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐Ÿฏ๐Ÿฎ๐Ÿญ

๐—”๐—ฅ๐—–๐—›๐—œ๐—ง๐—˜๐—–๐—ง: Holeman Group, Inc. holemangroupinc.com
๐—–๐—œ๐—ฉ๐—œ๐—Ÿ: BSE Consultants bseconsult.com
๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—จ๐—ฅ๐—”๐—Ÿ: MK Structural Engineering mkstructural.com
๐— /๐—˜/๐—ฃ: DDC Engineering ddc-engineers.com
๐—Ÿ๐—”๐—ก๐——๐—ฆ๐—–๐—”๐—ฃ๐—˜: Susan Hall, ASLA hall-la.com
๐—–๐—Ÿ๐—œ๐—˜๐—ก๐—ง: The Viera Co. viera.com
๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐— ๐—”๐—ก๐—”๐—š๐—˜๐—ฅ: Ricky Melรฉndez
๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง: Casey Rebensky

.melendez.982

09/28/2026

๐Ÿšง ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ ๐—จ๐—ฃ๐——๐—”๐—ง๐—˜ ๐Ÿšง
It might be tough to see ๐—ฎ๐—น๐—น ๐˜๐—ต๐—ฒ ๐—ฝ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ when you drive past the new three-story ๐—•๐—ฅ๐—˜๐—ฉ๐—”๐—ฅ๐—— ๐—–๐—ข๐—จ๐—ก๐—ง๐—ฌ ๐—ฆ๐—›๐—˜๐—ฅ๐—œ๐—™๐—™'๐—ฆ ๐—ข๐—™๐—™๐—œ๐—–๐—˜ Regional Law Enforcement Training Center on Judge Fran Jamieson Way in Viera, but trust us, there's A LOT happening there, with 25 to 60 subcontractors working on the jobsite EACH DAY throughout the week. Just take a look at all that's been accomplishedโ€”and a peek at what's coming next.

โœ… ๐—–๐—ข๐— ๐—ฃ๐—Ÿ๐—˜๐—ง๐—˜๐——:
+ Turn lane curb complete and at sub grade
+ Underground drainage - South/West sides of site
+ Mechanical yard has been poured
+ Chiller pipes for the A/C units installed and welded
+ All panel-to-panel joints have been caulked
+ Structural steel at grand entrance
+ All floor levels have been poured (1st, 2nd + 3rd)
+ 3rd level exterior wall framed out and waterproofed exterior
+ Interior framing on 1st level
+ All exit stairs installed and poured
+ All safety rails installed

๐Ÿšง ๐—œ๐—ก ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ:
+ Turn lane rock bed and asphalt
+ Interior framing on the 2nd level
+ 1st level overhead rough-ins (water, fire + electrical)
+ Roof dry-in on all levels
+ Underground electrical conduits to generator and dumpster pad
+ Underground drainage on east side of site
+ Window installation - all around the building
+ Pouring 3rd level decking above grand entrance
+ Touching up brick on exterior panels

๐Ÿ”œ ๐—จ๐—ฃ ๐—ก๐—˜๐—ซ๐—ง:
+ Sidewalks laid out and poured
+ Dumpster pad layouts and poured
+ Getting site graded out
+ Utilities, gas line and water line
+ 2nd level overhead and wall rough-ins
+ 3rd level framing, overhead and wall rough-ins
+ HVAC ductwork throughout building
+ Drywall for metal studs on all levels
+ Exterior windows and storefronts
+ Exterior doors installation

Each and every milestone brings this state-of-the-art training facility another step closer to allowing ๐—•๐—ฟ๐—ฒ๐˜ƒ๐—ฎ๐—ฟ๐—ฑ ๐—–๐—ผ๐˜‚๐—ป๐˜๐˜† ๐—ฆ๐—ต๐—ฒ๐—ฟ๐—ถ๐—ณ๐—ณ'๐˜€ ๐—ข๐—ณ๐—ณ๐—ถ๐—ฐ๐—ฒ to serve our community.

Be sure to follow @๐˜„๐—ท๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐Ÿฏ๐Ÿฎ๐Ÿญ as we continue sharing updates on this exciting project!

๐Ÿ‘ท ๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐—ง๐—˜๐—”๐— :
๐—”๐—ฅ๐—–๐—›๐—œ๐—ง๐—˜๐—–๐—ง: Tsark Architecture (tsarkarchitecture.com)
๐—–๐—œ๐—ฉ๐—œ๐—Ÿ: B.S.E. Consultants, Inc. (bseconsult.com)
๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—จ๐—ฅ๐—”๐—Ÿ: Adams Engineering (asengr.com)
๐— /๐—˜/๐—ฃ: DDC Engineers, Inc. (ddc-engineers.com)
๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง: Jeff Lownes
๐—”๐—ฆ๐—ฆ๐—ง. ๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง J.J. Silberzahn .silberzahn
๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐— ๐—”๐—ก๐—”๐—š๐—˜๐—ฅ: Travis Lorenzen

x.com/brevardsheriff youtube.com/c/brevardsheriff

Calling all local creatives, makers & small businesses! ๐ŸŽWeโ€™re looking for vendors to join us for the VRBA Holiday Showc...
09/25/2026

Calling all local creatives, makers & small businesses! ๐ŸŽ

Weโ€™re looking for vendors to join us for the VRBA Holiday Showcase on November 17 at Central Park at The Avenue!

If you have a small business, handmade products, unique gifts, art, or something special to share, weโ€™d love to have you be part of this festive evening. Itโ€™s a great opportunity to showcase your products, connect with the community, and get your business in front of holiday shoppers. ๐Ÿ›๏ธ

Vendor spots are available now!
Sign up here: https://members.spacecoastchamber.com/chamber-events/Details/2026-holiday-showcase-viera-regional-business-alliance-1927026?sourceTypeId=Hub

Know a local maker or business that would be a great fit? Tag them below! ๐Ÿ‘‡

Thank you to our sponsors for making this event possible!
Champion Sponsor- Community Credit Union
Leader Sponsor- W+J Construction, Viera Builders, & Health First

09/25/2026

The ๐—™๐—”๐—Ÿ๐—Ÿ ๐—ฆ๐—˜๐—”๐—ฆ๐—ข๐—ก is in full swing and W+J Construction loves to support organizations and events in our community. Here's a recap of the events we supported last week...

๐Ÿ“† ๐—˜๐—ฉ๐—˜๐—ก๐—ง๐—ฆ ๐—ฆ๐—จ๐—ฃ๐—ฃ๐—ข๐—ฅ๐—ง๐—˜๐—— ๐—Ÿ๐—”๐—ฆ๐—ง ๐—ช๐—˜๐—˜๐—ž: ๐Ÿ“†
9/18 - Beyel Bros. Construction Angels Golf Tournament โ›ณ๐ŸŒ๏ธ
9/19 - Local Girls Social "Paws for a Cause" ๐Ÿพ๐Ÿถ
9/19 - Brevard Schools Foundation - Take Stock in Children "Reach for the Stars Gala" ๐ŸŽ“โœจ

โ›ณ ๐—•๐—ฒ๐˜†๐—ฒ๐—น ๐—•๐—ฟ๐—ผ๐˜€. ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—”๐—ป๐—ด๐—ฒ๐—น๐˜€ ๐—–๐—ต๐—ฎ๐—ฟ๐—ถ๐˜๐˜† ๐—š๐—ผ๐—น๐—ณ ๐—ง๐—ผ๐˜‚๐—ฟ๐—ป๐—ฎ๐—บ๐—ฒ๐—ป๐˜ on Fri. Sept. 18 at Rockledge Country Club. ๐Ÿ“ธ Pictured on the links from left to right are: Ryan Taylor, Steve Carlyle, Weston Perkins and Garrett Tantius. The tournament benefits Construction Angels -- a charity that provides immediate financial assistance and grief counseling to the families of fallen construction workers and scholarship opportunities to qualifying applicants (children who have lost a parent or seeking education in construction). For more details, visit constructionangels.us

๐Ÿพ๐—Ÿ๐—ผ๐—ฐ๐—ฎ๐—น ๐—š๐—ถ๐—ฟ๐—น๐˜€ ๐—ฆ๐—ผ๐—ฐ๐—ถ๐—ฎ๐—น "๐—ฃ๐—ฎ๐˜„๐˜€ ๐—ณ๐—ผ๐—ฟ ๐—ฎ ๐—–๐—ฎ๐˜‚๐˜€๐—ฒ" on Sat. Sept. 19 at Duran Golf Course. We were proud to be the title sponsor for this inaugural community event, featuring on-site adoptable dogs from our local animal shelter, workout classes fundraising for the shelter, local vendor market and business activations and more to support the Brevard Humane Society. Representing the W+J team at the event: Adriane Rowley, April Murray and Denise Marschhauser. For more info: localgirlsocial.net

๐ŸŽ“๐—ง๐—ฎ๐—ธ๐—ฒ ๐—ฆ๐˜๐—ผ๐—ฐ๐—ธ ๐—ถ๐—ป ๐—–๐—ต๐—ถ๐—น๐—ฑ๐—ฟ๐—ฒ๐—ป "๐—ฅ๐—ฒ๐—ฎ๐—ฐ๐—ต ๐—ณ๐—ผ๐—ฟ ๐˜๐—ต๐—ฒ ๐—ฆ๐˜๐—ฎ๐—ฟ๐˜€ ๐—š๐—ฎ๐—น๐—ฎ" on Sat. Sept. 19 at Hilton Rialto Melbourne. W+J Construction was thrilled to once again be the presenting sponsor for Brevard Schools Foundation's 14th Annual Gala on Sat. Sept. 19. The elegant event was attended by members of the W+J team (+ spouses): Travis (+ Elizabeth) Lorenzen, Jennifer (+Ricky) Melo, Bradley (+ Brandi) Wyrick, Mark (+ Ella) Mitchell and Avery (+ Taylor) Eubank. The event benefits Take Stock in Children of Brevard, raising critical funds to support scholarships and mentoring for deserving students in grades 7โ€“12 across Brevard County.

Our support of these organizations and more exhibits W+J's continued commitment to Building Community Since 1965. โ™ฅ๏ธ๐Ÿ–ค

Follow us on Facebook, Instagram, LinkedIn, X and YouTube to stay in the know for all of our future events and involvement.

09/23/2026

Lots of ๐Ÿšง๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ๐Ÿšง to report at AME Park, the new home of CrossFit Viera!

โœ… ๐—–๐—ข๐— ๐—ฃ๐—Ÿ๐—˜๐—ง๐—˜๐——:
+ Exterior awnings
+ Metal garage doors
+ Sidewalks around building
+ Dumpster corral
+ Water main connections
+ Site drainage catch basins
+ Easements recorded
+ Interior painting
+ Stairway installation
+ Energy-efficient LED overhead lights
+ Large ceiling fans (24' + 16')
+ Bathrooms + showers tile

๐Ÿšง ๐—œ๐—ก ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ:
+ Interior glass into frames
+ Bathroom partitions
+ Upstairs handrail
+ Electricians preparing site conduit for FPL connection

๐Ÿ”œ ๐—จ๐—ฃ ๐—ก๐—˜๐—ซ๐—ง:
+ Accent tile to complete bathrooms + showers
+ Upstairs flooring
+ Rubber flooring downstairs
+ Custom-built light in lobby

W+J Construction is building the 13,778 sq. ft. commercial building consisting of three units, the first with 6,889 sq. ft., and two units with 3,444 sq. ft. each. CrossFit Viera will occupy one of the units and the other two are TBD. This new building is located on 1.6 acres at 1006 Viera Blvd.

๐—”๐—ฅ๐—–๐—›๐—œ๐—ง๐—˜๐—–๐—ง: Tsark Architecture tsarkarchitecture.com
๐—–๐—œ๐—ฉ๐—œ๐—Ÿ: Construction Engineering Group (CEG) cegengineering.com
๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—จ๐—ฅ๐—”๐—Ÿ: Adams Engineering asengr.com
๐— /๐—˜/๐—ฃ: Construction Engineering Group cegengineering.com
๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง: John Smith
๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐— ๐—”๐—ก๐—”๐—š๐—˜๐—ฅ: Katie Smallwood
๐—–๐—Ÿ๐—œ๐—˜๐—ก๐—ง: AME Park Viera / CrossFit Viera
๐—™๐—œ๐—ก๐—”๐—ก๐—–๐—˜๐—— ๐—•๐—ฌ: Community Credit Union

crossfitviera.com

09/21/2026

๐Ÿšง ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ ๐—จ๐—ฃ๐——๐—”๐—ง๐—˜ ๐Ÿšง
Here are the updates on ๐—ฆ๐—ง๐—”๐——๐—œ๐—จ๐—  ๐—ฆ๐—ค๐—จ๐—”๐—ฅ๐—˜ - a new multi-tenant mixed use (restaurant/retail) building coming soon to Viera South. This brand-new built-to-suit retail strip center is located near the southwest corner of Stadium Parkway & Pineda Blvd. It will contain seven units in total (๐™ค๐™ฃ๐™ก๐™ฎ ๐—ง๐—ช๐—ข ๐™ง๐™š๐™ข๐™–๐™ž๐™ฃ ๐™–๐™ซ๐™–๐™ž๐™ก๐™–๐™—๐™ก๐™š) - both end-units with 2,500 sq. ft. each with drive-thru or outdoor seating - perfect opportunities for restaurant/coffee users. This project is a collaboration between ๐—”๐——๐—œ ๐——๐—ฒ๐˜ƒ๐—ฒ๐—น๐—ผ๐—ฝ๐—บ๐—ฒ๐—ป๐˜ and ๐—ช+๐— ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป.

โœ… ๐—–๐—ข๐— ๐—ฃ๐—Ÿ๐—˜๐—ง๐—˜๐——:
+ storefront window frames and glass
+ exterior stucco
+ roofing
+ front sidewalk formed and poured
+ accessible parking spaces poured

๐Ÿšง ๐—œ๐—ก ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ:
+ setting sewer structures and pipe
+ installing fire sprinkler system
+ forming and pouring parking lot curbs
+ grading main parking lot in preparation for pavement
+ installing landscape chases

๐Ÿ”œ ๐—จ๐—ฃ ๐—ก๐—˜๐—ซ๐—ง:
+ installing 4 grease traps
+ completing sanitary connections
+ finishing storm drain installation
+ exterior priming and painting
+ installing Nichiha siding panels

Stay tuned to @๐˜„๐—ท๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐Ÿฏ๐Ÿฎ๐Ÿญ on all our social channels so you don't miss a moment as we bring this new building to Viera.

๐Ÿ‘ท ๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐—ง๐—˜๐—”๐— :
๐—”๐—ฅ๐—–๐—›๐—œ๐—ง๐—˜๐—–๐—ง: DNA Architects (architectweekly.com/listing/dave-nagrodsky-architects)
๐—–๐—œ๐—ฉ๐—œ๐—Ÿ: B.S.E. Consultants, Inc. (bseconsult.com)
๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—จ๐—ฅ๐—”๐—Ÿ: Adams Engineering (asengr.com)
๐— /๐—˜/๐—ฃ: Creative Design Engineering (creativemep.com)
๐—Ÿ๐—”๐—ก๐——๐—ฆ๐—–๐—”๐—ฃ๐—œ๐—ก๐—š: Susan Hall, ASLA (hall-la.com)
๐—ช+๐— ๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง: Josh Overton
๐—ช+๐— ๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐— ๐—”๐—ก๐—”๐—š๐—˜๐—ฅ: Weston Perkins ()
๐—™๐—œ๐—ก๐—”๐—ก๐—–๐—˜๐—— ๐—•๐—ฌ: Community Credit Union Florida ()

09/18/2026

A quick ๐Ÿšง ๐—ฃ๐—ฅ๐—ข๐—š๐—ฅ๐—˜๐—ฆ๐—ฆ ๐—จ๐—ฃ๐——๐—”๐—ง๐—˜ ๐Ÿšง on The Viera Company's new amenity center for the ๐—Ÿ๐—ฎ๐˜‚๐—ฟ๐—ฎ๐˜€๐—ถ๐—ฎ ๐—–๐—ผ๐—บ๐—บ๐˜‚๐—ป๐—ถ๐˜๐˜† in Southwest Viera as it nears completion...

๐—ฅ๐—˜๐—–๐—˜๐—ก๐—ง๐—Ÿ๐—ฌ ๐—–๐—ข๐— ๐—ฃ๐—Ÿ๐—˜๐—ง๐—˜๐——:
โœ”๏ธ Bathrooms are complete
โœ”๏ธ Picnic furniture has been assembled
โœ”๏ธ Site grading

๐—จ๐—ฃ ๐—ก๐—˜๐—ซ๐—ง:
โž• Sidewalks
โž• Landscaping
โž• Golf cart parking
โž• Playground/Workout area

๐—ง๐—ต๐—ถ๐˜€ ๐—น๐—ฎ๐—ธ๐—ฒ๐—ณ๐—ฟ๐—ผ๐—ป๐˜ ๐—ฎ๐—บ๐—ฒ๐—ป๐—ถ๐˜๐˜† ๐—ณ๐—ผ๐—ฟ ๐˜๐—ต๐—ฒ ๐—ฟ๐—ฒ๐˜€๐—ถ๐—ฑ๐—ฒ๐—ป๐˜๐˜€ ๐—ผ๐—ณ ๐—Ÿ๐—ฎ๐˜‚๐—ฟ๐—ฎ๐˜€๐—ถ๐—ฎ ๐˜„๐—ถ๐—น๐—น ๐—ฐ๐—ผ๐—ป๐˜€๐—ถ๐˜€๐˜ ๐—ผ๐—ณ:
โ€ข 2,079 sq. ft. restroom pavilion, including
โ—ฆ 739 sq. ft. of enclosed restrooms and
โ—ฆ 1,340 sq. ft. of covered exterior seating
โ€ข 432 sq. ft. open-air pavilion/gazebo overlooking the water
โ€ข 798 sq. ft. fitness area to accommodate future outdoor workout equipment
โ€ข Golf cart parking at amenity entrance
โ€ข North side of the site will be prepped for a playground

With more than 60 years of experience in the construction industry, W+J Construction is proud to have been selected for this project. Follow us on Facebook, Instagram, LinkedIn and YouTube to stay in the know on all projects at W+J Construction.

๐—”๐—ฅ๐—–๐—›๐—œ๐—ง๐—˜๐—–๐—ง: Holeman Group, Inc. www.holemangroupinc.com
๐—–๐—œ๐—ฉ๐—œ๐—Ÿ: BSE Consultants www.bseconsult.com
๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—จ๐—ฅ๐—”๐—Ÿ: MK Structural Engineering www.mkstructural.com
๐— /๐—˜/๐—ฃ: DDC Engineering www.ddc-engineers.com
๐—–๐—Ÿ๐—œ๐—˜๐—ก๐—ง: The Viera Co.
๐—ฆ๐—จ๐—ฃ๐—˜๐—ฅ๐—œ๐—ก๐—ง๐—˜๐—ก๐——๐—˜๐—ก๐—ง: Gene Poormon
๐—ฃ๐—ฅ๐—ข๐—๐—˜๐—–๐—ง ๐— ๐—”๐—ก๐—”๐—š๐—˜๐—ฅ: Chad Laston / Zach Graham

09/16/2026

๐ŸŽ‰ Please join us in celebrating these W+J team members on their work anniversaries for the months of AUGUST | SEPTEMBER | OCTOBER:

+ Erik Costin - 22 years! ๐ŸŽ‰
+ Steve Carlyle - 19 years
+ Horace Sharpe - 15 years
+ Ricky Melendez - 12 years
+ Jeff Lownes - 9 years
+ Jason McGinnis - 6 years
+ Bradley Wyrick - 4 years
+ April Murray - 2 years
+ Calvin Smith - 2 years
+ Kurt Bradtmueller - 2 years
+ Nirvan Jaggernauth - 1 year

These W+J team members are Building a Better Brevard, everyday, and we salute them! ๐Ÿ‘

#2026

09/14/2026

๐—Ÿ๐—”๐—ž๐—˜๐—ฆ๐—œ๐——๐—˜ ๐—ฆ๐—ข๐—–๐—œ๐—”๐—Ÿ ๐—ฎ๐˜ ๐—ฉ๐—ถ๐—ฒ๐—ฟ๐—ฎ ๐—ง๐—ผ๐˜„๐—ป ๐—–๐—ฒ๐—ป๐˜๐—ฒ๐—ฟ ๐—ฃ๐—ฎ๐—ฟ๐—ธ โ€” ๐—•๐˜‚๐—ถ๐—น๐˜ ๐—ฏ๐˜† ๐—ช+๐— ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ณ๐—ผ๐—ฟ ๐—ง๐—ต๐—ฒ ๐—ฉ๐—ถ๐—ฒ๐—ฟ๐—ฎ ๐—–๐—ผ๐—บ๐—ฝ๐—ฎ๐—ป๐˜†

The word is outโ€”Lakeside Social at Viera Town Center Park is Vieraโ€™s newest gathering place! The park made its debut with an exciting Labor Day weekend Grand Opening celebration, and W+J Construction was proud to be a sponsor of the festivities. Our team participated in Friday eveningโ€™s ribbon-cutting ceremony and enjoyed meeting guests throughout the event.

We are incredibly proud to add this project to our growing portfolio of work completed for The Viera Company. Located across from The Avenue Viera near Urban Prime and Duran Golf Club, the 2.5-acre lakefront park features a performance pavilion with flexible lawn space, a food truck court with aluminum shade structures, a large covered bar with a deck overlooking the water, restrooms, a utility and storage building, and parking.

Follow @๐˜„๐—ท๐—ฐ๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐Ÿฏ๐Ÿฎ๐Ÿญ to see what we build next!



CIVIL: ๐—•.๐—ฆ.๐—˜. ๐—–๐—ผ๐—ป๐˜€๐˜‚๐—น๐˜๐—ฎ๐—ป๐˜๐˜€ www.bseconsult.com
STRUCTURAL: ๐— ๐—ž ๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น ๐—˜๐—ป๐—ด๐—ถ๐—ป๐—ฒ๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด www.mkstructural.com
MEP: ๐—ฑ๐—ฑ๐—ฐ ๐—˜๐—ป๐—ด๐—ถ๐—ป๐—ฒ๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด www.ddc-engineers.com
ARCHITECT: ๐—›๐—ผ๐—น๐—ฒ๐—บ๐—ฎ๐—ป ๐—š๐—ฟ๐—ผ๐˜‚๐—ฝ ๐—œ๐—ป๐—ฐ. www.holemangroupinc.com
PROJECT MANAGER: Chad Laston
SUPERINTENDENTS: Brian Seli and Chris Moretz

Address

1005 Viera Boulevard , Suite 202
Rockledge, FL
32955

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+13216327660

Alerts

Be the first to know and let us send you an email when W+J Construction Corp. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category