06/16/2026
Let's check in with our poured basement house build. All this took about 3 weeks after the lot was cleared.
This build will have a beautiful walk-out basement facing the body of water the lot sits next to. That means our approach to this build is a little different. Keep watching and check back in for more updates.
Call or text us at (803) 412-2986 or email [email protected].