Clear Leaf

Call Directions Website Contact the business

Clear Leaf Utility pipe subcontractor working real jobs in the field.

Storm & utility pipe, equipment, and jobsite life — field-tested tools, trade tips, and real talk from the trench.

🛠️ Tools we actually run → link in bio

10/18/2026

What's the first tool you grab when a line starts weeping water?

10/17/2026

Solid infrastructure underneath, solid growth behind $UDF.

10/16/2026

Finishing the week with clean pipe runs and zero rework.

10/15/2026

Prepping sidewalk subgrade in Spanish Fork along the string line. The GC’s mini blades base dirt while their roller locks down final density—on soil that goes back further than most realize. In September 1776, Spanish friars Escalante and Domínguez led the first European expedition down Spanish Fork Canyon into this valley. 250 years later, we’re building on the exact same dirt.Did you know Spanish Fork’s history went back to 1776?

10/15/2026

Cold air, hot hydraulics, thick mud.

10/14/2026

High-capacity storm retention pipe tied directly into precast inlet structures. Double-checking inverts, locking down connections, and keeping grade on point before backfill

10/14/2026

A bad grade check early in the morning costs you the whole afternoon.

10/13/2026

The things people do to make an honest living. Down six feet deep in a mud trench holding a wide-open gas saw in 100-degree heat, you quickly learn what real work looks like. Keep the blade spinning and get the job done right.

10/13/2026

High-pressure water and tight utility corridors require steady hands.

10/12/2026

How to read the wood for a top back of wall offset at a power line crossing.

Here is the exact step-by-step breakdown for reading offset, structure location, and fill calls on the stake:

OFFSET
5 circled with TBW at the top means you pull a 5-foot straight offset from the hub to your top back of wall alignment.

LOCATION / CONFLICT ZONE
@ POWER CROSSING identifies your exact structure location where you are crossing a power line encasement.

FILL CALL
Next up, your elevation call.

F 1.91 TBW means fill 1.91 feet (1 foot 11 inches) off the top of the hub to hit top back of wall.

Notice there is no cut call here—your base excavation and footing depth come directly off your city detail drawings for this wall type.

VERTICAL MATH
Do all your vertical math right off the top of the hub to establish your wall top elevation and keep your clearances true over that power crossing.

Address

Serves Utah County
Richfield, UT

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm
Saturday 7am - 4pm
Sunday 7am - 4pm

Telephone

+18014307862

Alerts

Be the first to know and let us send you an email when Clear Leaf posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Clear Leaf:

Shortcuts

Share