01/16/2026
Quality installation starts with attention to detail.
GA Cox Company, Inc. is installing Turner’s 30” Class III pipe on the Possum Trot project in Waco. Class III RCP is engineered for strength, durability, and long-term performance in drainage and infrastructure applications.
This installation also features a properly constructed concrete headwall, designed to protect the pipe opening, control erosion, and ensure smooth, efficient water flow. With solid formwork, clean edges, and precise alignment, the headwall adds both structural integrity and longevity to the system.
Well-built headwall and a great installation by the crew—built to last.