Mountain West Builders

Mountain West Builders Specializing in Multi-Family, Hospitality and Commercial construction.

Last Friday, we held our 7th Annual Charity Golf Tournament, benefiting the Veterans Guest House. It was a beautiful, ho...
08/25/2026

Last Friday, we held our 7th Annual Charity Golf Tournament, benefiting the Veterans Guest House. It was a beautiful, hot day! We want to thank all our sponsors and everyone who donated. It was a huge success!
Breakfast Sponsor – TerraFlor Solutions (Ellie Nunez)
Lunch Sponsor – Joy Engineering
Drink Sponsors – Greenstreet & Joy Engineering
Score Card – Sommercal
Golf Ball Sponsors – Nevada Drywall Stucco & Stone and Enix Mechanical
Closest to the Pin Sponsor – DNA Framing
Longest Drive Sponsor – LP Insurance
$10k Hole-in-One Sponsor – HTA Plumbing

At Our Kiley View Project - The Clubhouse wall and ceiling wood accents, are starting to be installed including the star...
08/17/2026

At Our Kiley View Project - The Clubhouse wall and ceiling wood accents, are starting to be installed including the start of the cabinets and flooring. The first building’s roof is finishing including installation of the stairs and starting HVAC for the units; the site is now paved and most of the sidewalks are also poured with progress continuing as scheduled!

Celebrating Julie’s 2-Year AnniversaryMWB is proud to celebrate Julie and recognize her two years of dedication to our t...
08/14/2026

Celebrating Julie’s 2-Year Anniversary
MWB is proud to celebrate Julie and recognize her two years of dedication to our team. As our Office Manager/Contract Administrator, Julie plays an important role in issuing subcontractor contracts and keeping insurance documentation organized and up to date. She also brings a can-do attitude to everything she takes on and consistently steps up to support the team wherever she is needed.

Thank you, Julie, for your hard work, attention to detail, and continued commitment to MWB!

08/12/2026

Don't forget our Warehouse Sale starts this Thursday! Many different builder items for sale!
Thursday and Fridays through the end of August. Except for August 21st.
Contact: 775-525-1084 for more information, location and pickup.
Cash only, preferred.
All reasonable offers will be considered!

Description & Quantity
Perlick ADA Undercabinet Drawer Refrigerator 2
Perlick ADA Undercabinet Drawer Refrigerator (Without Stainless Steel Faces) 2
Jenn air 36" Commercial Style Wall Mounted Canopy Range Hood 3
Jennair 36" Commercial Style Wall Mounted Canopy Range Hood (Without Vents) 1
Stainless Steel Undermount Sinks 21" x 15.5" x 9" 5
Stainless Steel Undermount Sinks 28" x 16" x 6" 4
Stainless Steel Undermount Sinks 30" x 16" x 6" 2
Stainless Steel Undermount Sinks 30" x 16" x 9" 7
Stainless Steel Top Mount Double Bowl Sinks 31" x 20" x 9" 1
Jasco in Wall Smart Dimmer 46564 165
Jasco in Wall Add-On Switch 46560 241
Jasco Smart Switch 46562 1337
Dwelo Hub3 113
Honeywell T6 Pro-Zwave Thermostats 130
Kichler Ciona 1-Light Wall Sconce 60
Progress Lighting Parkhurst Brushed Bronze Wall Sconce P710111-109 38
Progress Lighting Parkhurst Brushed Bronze Wall Sconce P5801 33
Omega 2 10' outdoor heater 2
Gotham Architectural Downlighting 5
Hinkley Bronze Hanging Lamp 43" Diameter 1
Stone Lighting LED Chandelier 1
Hinkley Astrid 5 Light Pendant 1
Suro Bathroom Fixture W36 x H28 LED Lighted Mirror 2
Hydrel 9" LED Step Lights 4
Alfa Pizza Oven 1
Ashland Keyed Slide door Trim Set 6
Quorum International Pendant Light 26
Café Appliance Brushed Bronze Handle Kit (Vares sizes) 4
Mitzi Wall Sconce Light Black and Gold 1
Kwikset Home Connect 620 Keypad Connected Smart Lock 120
Crystal Fire Plus 20" fire insert 4
Crystal Fire Plus 24"x24" fire insert 2

Don't forget our Warehouse Sale starts this Thursday! Many different builder items for sale!Thursday and Fridays through...
08/10/2026

Don't forget our Warehouse Sale starts this Thursday! Many different builder items for sale!

Thursday and Fridays through the end of August. Except for August 21st.
Contact: 775-525-1084 for more information, location and pickup.
Cash only, preferred.

All reasonable offers will be considered!

MWB is proud to celebrate Juan on his 6 year work anniversary!Juan brings a diverse and valuable skill set to our team, ...
08/10/2026

MWB is proud to celebrate Juan on his 6 year work anniversary!
Juan brings a diverse and valuable skill set to our team, specializing as a drywall patch laborer and detailer. His dedication and consistent commitment make a meaningful impact on our projects every day. Thank you, Juan, for your hard work, and the pride you put into in your craftsmanship.

MWB is proud to celebrate Tom’s 5-year anniversary with our team!Tom has been a valued member of MWB since August 5, 202...
08/06/2026

MWB is proud to celebrate Tom’s 5-year anniversary with our team!
Tom has been a valued member of MWB since August 5, 2021, and we are grateful for the dedication, leadership, and hard work he brings to every project. As one of our Project Managers, Tom has played an important role in projects such as Integra Apartments and is currently helping bring Elysium Luxury Living Apartments to life.
Thank you, Tom, for your continued commitment and contributions over the past five years. We appreciate everything you do!

Warehouse Inventory SaleA variety of items for sale from a local builder looking to clean out their warehouse. A few of ...
08/04/2026

Warehouse Inventory Sale
A variety of items for sale from a local builder looking to clean out their warehouse. A few of the items include smart hubs and switches, key locks, thermostats, and misc. lighting. There are some small appliances and stainless-steel sinks.
Starting August 13th.
Thursday and Fridays through the end of August. Except for August 21st.
Contact: 775-525-1084 for more information, location and pickup.
Cash only, preferred.

At Our Kiley View Project: The Clubhouse interior is now being painted, with other finishes ongoing, and the exterior st...
07/13/2026

At Our Kiley View Project: The Clubhouse interior is now being painted, with other finishes ongoing, and the exterior stucco of the clubhouse is being colored. The pool has been dug!

The 1st building at the entrance, BLDG #13, is now at the 3rd-floor framing stage, with the roof starting next week. Framing is ongoing at (3) other buildings.

Most of the site has also been paved, and the curbs and gutters have been poured.

Our new Summit Heights project will have 70 age- and income-qualified units. The site work has officially started, and w...
07/06/2026

Our new Summit Heights project will have 70 age- and income-qualified units. The site work has officially started, and we are looking forward to building another quality project in Reno.

Address

9590 Prototype Court, Suite 100
Reno, NV
89521

Alerts

Be the first to know and let us send you an email when Mountain West Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Mountain West Builders:

Shortcuts

Featured

Share