08/20/2026
More than 1,000 feet below the surface, our team is making progress on the revamp of the pump room at the 1,250 level of the Sanford Underground Research Facility.
The project includes preparing the underground space, cutting and removing concrete for new piping, and getting the room ready for the installation of new pump equipment. With limited access and the added logistics of transporting crews, materials, and equipment underground, every step requires careful coordination.