01/13/2024
Here we are on one of our biggest projects yet. We noticed that above the new kitchen there was no insulation or ventilation so we wil be adding a vaulted area in this area. As you can see the there is a lot of k**b and tub but that wi get completely abandoned and new wires ran to bring the home to code. I’m sure you noticed the new insulation as well we are insulating the walls with r-19 and building the kitchen exterior wall out another 3&1/2”. The rest of the exterior walls will be built out to 6” depth for the r-19 insulation. We then will be installing beams new rafters for the cathedral look in the kitchen then new walls in the kitchen with plenty of blocking to ensure straight and secure walls for the amazing cabinets and backsplash the be installed. If you can dream it we can definitely make it happen the more complicated the better!